37kw compressor suppliers 3 section vsd screw CZPT
Features Of Sevro CZPT CZPT Air CZPT
1. Small, fast action quick response, huge overload potential, extensive velocity assortment
2. The reduced-pace torque, low volatility, secure procedure
three. Low sound, higher performance
4.The rear conclude of the encoder comments (optional) represent a DC servo etc.
five. swing selection, frequency adjustable
six. The angle of Induction motor is three.6°1.eight, the servo motor is extremely Management accuracy, the angle is .036°, To attain a closed-loop control of place, velocity and torque To defeat the issue of out of step of Induction motor.
seven. different overall performance:
The induction motor is Open up-loop handle, the hugely CZPTt Frequency or overload, it easy to Lost step or Stall, when stop, the high pace will be Overshoot phenomenon. Therefore, in purchase to make sure its manage accuracy, Ought to handle the acceleration and deceleration dilemma.
The servo motor is Closed-loop handle, The driver sampling directly to feedback signal of Motor encoder, Inner framework Place loop and Pace loop, It does not look Misplaced phase or Overshoot, There is a lot more trustworthy management performance
8. The velocity in reaction is diverse
It require two hundred to 400 ms of Induction motor to speed up from standstill to functioning pace. But for servo motor, it only takes many ms to accelerate velocity to 3000 rpm , It can be used to manage purposes that require fast begin-quit.
nine. comfort: warmth and sound drastically reduced.
Easy level that is: The induction motor, it will working for a although due to the fact of its own inertia following cut the energy. But servo motors are quit rapidly, start off quickly, rapidly reaction
TCEHNICAL Specifications OF THE Immediate Driven SCREW AIR CZPT | |||||||||||
Design | AHD-30A | AHD-50A | AHD-75A | AHD-100A | AHD-120A/W | AHD-150A/W | AHD-175A/W | AHD-220A/W | AHD-250A/W | AHD-300A/W | AHD-350A/W |
Cost-free air supply /Discharge strain (m3/min /Mpa) | 3.eight/.7 three.6/.8 three.2/1. 2.8/one.two |
6.8/.7 six.two/.8 five.six/1. four.9/1.2 |
10./.seven 9.one/.8 eight.5/1. seven.6/one.2 |
13.five/.7 twelve.6/.eight 11.2/1. ten./one.2 |
16.1/.seven fifteen./.eight 13.8/one. twelve.three/1.two |
21./.7 19.eight/.8 seventeen./one. fifteen.3/1.2 |
twenty five.two/.seven 24./.8 21./one. 18.3/one.two |
28.seven/.seven 27.six/.8 24.6/1. 21.five/one.2 |
32./.seven thirty.5/.8 27.5/1. 24.eight/one.two |
36.seven/.seven 34.5/.8 30.two/one. 27.8/1.2 |
42./.7 40.five/.eight 38.1/1. 34.6/1.two |
No.of compression stage | one stage | ||||||||||
Ambient temperature | ‘-five–+45oC | ||||||||||
CZPT design | Air –CZPT | Air-CZPT&Drinking water-CZPT | Water-CZPT | ||||||||
Discharge temperature (0C) | Ambient temperature+15oC | ||||||||||
CZPT(L) | eighteen | thirty | sixty five | 90 | a hundred and ten | ||||||
Noise amount (Db) | 68±2 | 72±2 | 75±2 | 72±2 | |||||||
CZPT strategy | Direct push | ||||||||||
CZPTtricity (V/ph/Hz) | 380/three/fifty | ||||||||||
Electrical power (KW/HP) | 22/thirty | 37/50 | fifty five/75 | 75/one hundred | 90/120 | a hundred and ten/150 | 132/175 | a hundred and fifty/200 | 185/250 | 220/300 | 250/350 |
CZPTting technique | Y-ΔCZPTter | ||||||||||
Dimension: length/ width/ peak (mm) |
1400* 900* 1220 |
1400* 900* 1220 |
1800* 1200* 1600 |
1900* 1200* 1600 |
2100* 1400* 1780 |
2360* 1360* 1800 |
2460* 1420* 1800 |
2560* 1540* 1840 |
2610* 1640* 2050 |
2700* 1740* 2100 |
2900* 1850* 2200 |
Fat(kg) | 680 | 1060 | 1880 | 1980 | 2100 | 2900 | 3500 | 3900 | 4200 | 4600 | 5000 |
Air outlet pipe diameter (inch/mm) | one” | 1 1/two” | 2″ | DN65 | DN80 | DN100 |
Software
• Our goods are extensively utilised in electrical power era, semiconductor, shipbuilding, oil subject, rubber, foods, pharmacy, bundle, electronic, interaction, cement, eyeglasses, chemical, textile, papermaking, gas, and oil refining, and many others.
Our Manufacturing facility
Company Overview
HangZhou CZPT CZPT Co., Ltd.
• Skilled manufacturer of CZPT system tools
• Major merchandise incorporate CZPT Air CZPT & Piston Air CZPT
• Slicing-edge technological innovation & leading methods: CZPT German air end with SKF bearing, Siemens/ABB electric power program and spare areas of other world-CZPT brand names. To make certain trustworthiness, higher performance, low sounds and long daily life span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Particulars: CZPT crate pallet furthermore foam board and bubble film, Entire closed wooden scenario. 1pcs/every package (for stationary screw CZPT)
• CZPT method: by sea, by LCL/FCL or as requested
• Shipping and delivery strategy: FOB, CFR, CIF and EXW and so on.
• Shipping time: in seven-fifteen times right after obtaining deposit (CZPT machines not included)
Our Provider
Right after-sale Provider
• Any inquiries or requests ahead of, throughout or after product sales, we would like to help you any time and will find you the ideal resolution in 24 several hours.
• Guarantee: One 12 months for the total equipment CZPT spare components will be provided with very best cost.
• More than board engineer services is offered.
Special CZPT Service
one) Total OEM
• Quantity: at the very least 5 pcs
• In this strategy, we will do all the changes (Color, identify plate and brand) as your need, and will not cost further price.
two) 50 percent OEM
• Quantity: no limit
• Beneath this system, we can make the essential alteration (identify plate and logo) but we will charge some extra fee for the name plate, as the title plate manufacturing unit has the MOQ.
three) Emblem OEM
• Amount: no limit
• Only the symbol will be transformed to yours, and no additional fee will be charged.
Overseas Engineer Support
• We are offered to send out our engineer for aboard provider. Only want you to organize the accommodation, transportation and translator. Added expense for every will be discussed dependent on neighborhood cost degree.
FAQ
Q1: Are you manufacturing unit or trade company?
A1: We are manufacturing unit.
Q2: What the precisely deal with of your manufacturing unit?
A2: Our company is found in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Guarantee phrases of your device?
A3: One particular year guarantee for the machine and technical assist in accordance to your needs.
Q4: Will you offer some spare areas of the machines?
A4: Sure, of course.
Q5: What about item package deal?
A5: We pack our merchandise strictly with CZPT seaworthy situation.
Q6: What about the voltage of goods?
Can they be CZPT? A6: Of course, of course. The voltage CZPT according to your equirement.
Q7: Which payment phrase can you take?
A7: forty% T/T in sophisticated, 60% T/T against the B/L duplicate.
Q8: How long will you take to arrange manufacturing?
A8: 380V 50HZ we can shipping the merchandise within 7-fifteen times. Other electrical power or other colour we will supply inside twenty five-30 days.
Q9: Can you settle for OEM orders?
A9: Indeed, with expert style group, OEM orders are very welcome.
Q10: Which trade term can you accept?
A10: Accessible trade conditions: FOB, CIF, CFR, EXW, CPT, and so on