25HP Rotary CZPT Air CZPT CZPT Oil Free Air CZPT
Product Info
Characteristics Of Belt CZPTn CZPT Air CZPT
one . Air stop with high-effectiveness
two. Double CZPT with minimal sounds, Tremendous Silenced Enclosure
3. Elegant compact style. Fully open up accessibility door to internal areas for effortless provider.
4. one hundred% Continuous responsibility procedure. Load/No Load operation
five. Substantial top quality CE Certification industrial electric motors. ISO,CE,UL Certificate
six. Easy to use and read through Liquid crystal display handle panel
7. Large temperature, high force and anti-rotation shutdown
8. CZPT productive operation
nine. 5 micron, h2o-resistant air filtration content
10. 1year full device warranty,3years air stop guarantee.
eleven. CZPT the device with distinct working voltage according to customer’s request,
this sort of as: 380Volt,3phase,50hz
420Volt,3phase,50hz
380Volt,3phase,60hz
220Volt,3phase and 60hz, etc.
AIRHORSE SCREW AIR CZPT (BELT Pushed) | |||||||||||
Product | AHB-7A | AHB-10A | AHB-15A | AHB-20A | AHB-25A | AHB-30A | AHB-40A | AHB-50A | AHB-60A | AHB-75A | AHB-100A |
Totally free air deliver/ Discharge stress (m3/min/Mpa) |
.eighty five/.7 .75/.8 |
1.2/.7 1.one/.eight .9/1. .seven/one.2 |
1.6/.7 one.five/.eight one.three/1. one.1/one.2 |
two.5/.7 two.three/.8 2.1/1. 1.9/1.two |
3.2/.7 2.nine/.eight two.6/1. 2.two/one.2 |
3.eight/.seven 3.six/.8 3.2/one. two.8/1.2 |
5.2/.7 5./.8 4.five/1. 3.eight/one.2 |
6.8/.seven 6.2/.eight 5.6/1. four.9/one.two |
seven.3/.seven seven./.eight 6./one. five.6/one.2 |
ten./.7 9.one/.8 eight.5/1. seven.6/1.2 |
thirteen.five/.seven twelve.six/.8 eleven.two/1. 10./one.two |
Totally free air produce/ Discharge stress (CFM/PSI) |
30/102 27/116 |
42/102 39116 32/one hundred forty five twenty five/174 |
57/102 fifty three/116 forty six/one hundred forty five 39/174 |
88/102 81/116 seventy four/one hundred forty five sixty seven/174 |
113/102 102/116 92/145 78/174 |
134/102 127/116 113/a hundred forty five ninety nine/174 |
184/102 177/116 159/145 134/174 |
240/102 219/116 198/a hundred forty five 173/174 |
258/102 247/116 212/one hundred forty five 198/174 |
353/102 322/116 300/one hundred forty five 269/174 |
477/102 445/116 396/one hundred forty five 353/174 |
No.of compression stage |
single phase | ||||||||||
Ambient temperature | -five–+45°c | ||||||||||
CZPT product | Air –CZPT | ||||||||||
Discharge temperature (°c) |
Ambient temperature+15°c | ||||||||||
CZPT(L) | sixteen | eighteen | 30 | sixty five | |||||||
Sounds level(Db) | 62±2 | 64±2 | 62±2 | 68±2 | 72±2 | ||||||
CZPT strategy | Multivee belt | ||||||||||
CZPTtricity (V/ph/Hz) |
380/three/50 | ||||||||||
Electricity (KW/HP) |
five.5/7 | seven.5/ten | 11/fifteen | fifteen/twenty | eighteen.five/twenty five | 22/thirty | 30/40 | 37/fifty | 45/60 | fifty five/seventy five | seventy five/100 |
CZPTting strategy | Y-ΔCZPTter | ||||||||||
Dimension: duration/ width/ height(mm) |
800* 720* 950 |
860* 740* 960 |
1100* 850* 1160 |
1400* 950* 1300 |
1500* one thousand* 1420 |
1730* 1170* 1700 |
1820* 1250* 1760 |
||||
Weight(kg) | 128 | 240 | four hundred | 420 | 600 | 620 | 680 | 980 | 1050 | 1600 | 1800 |
Air outlet pipe diameter (inch/mm) |
three/4″ | 1″ | one one/2″ | two” |
Application
• Our merchandise are commonly utilised in power era, semiconductor, shipbuilding, oil area, rubber, foodstuff, pharmacy, bundle, digital, communication, cement, glasses, chemical, textile, papermaking, gasoline, and oil refining, and so on.
Our Factory
Firm Overview
HangZhou CZPT CZPT Co., Ltd.
• Expert producer of CZPT program gear
• Main products consist of CZPT Air CZPT & Piston Air CZPT
• Cutting-edge engineering & leading techniques: CZPT German air stop with SKF bearing, Siemens/ABB electricity program and spare elements of other planet-CZPT manufacturers. To make certain dependability, higher efficiency, lower sound and lengthy existence span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Information: CZPT crate pallet additionally foam board and bubble movie, Full closed wooden scenario. 1pcs/every bundle (for stationary screw CZPT)
• CZPT strategy: by sea, by LCL/FCL or as asked for
• Shipping approach: FOB, CFR, CIF and EXW and so on.
• Delivery time: in seven-fifteen days following acquiring deposit (CZPT machines not included)
Our Provider
Soon after-sale Service
• Any queries or requests ahead of, for the duration of or right after product sales, we would like to aid you any time and will locate you the very best solution in 24 several hours.
• Guarantee: A single calendar year for the entire device CZPT spare components will be presented with greatest price tag.
• More than board engineer provider is available.
Specific CZPT Support
1) Total OEM
• Amount: at minimum 5 pcs
• In this program, we will do all the changes (Coloration, title plate and symbol) as your require, and will not charge extra fee.
two) Half OEM
• Quantity: no limit
• Under this plan, we can make the necessary alteration (identify plate and emblem) but we will cost some additional payment for the identify plate, as the identify plate manufacturing unit has the MOQ.
three) Symbol OEM
• Quantity: no restrict
• Only the symbol will be transformed to yours, and no added price will be charged.
Overseas Engineer Services
• We are accessible to deliver our engineer for aboard provider. Only need you to prepare the accommodation, transportation and translator. Additional value for each will be reviewed dependent on local value amount.
FAQ
Q1: Are you manufacturing facility or trade organization?
A1: We are factory.
Q2: What the specifically tackle of your factory?
A2: Our firm is located in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Guarantee phrases of your equipment?
A3: A single calendar year warranty for the equipment and technical help according to your wants.
Q4: Will you offer some spare areas of the devices?
A4: Sure, of program.
Q5: What about item bundle?
A5: We pack our merchandise strictly with CZPT seaworthy scenario.
Q6: What about the voltage of items?
Can they be CZPT? A6: Yes, of course. The voltage CZPT in accordance to your equirement.
Q7: Which payment time period can you take?
A7: 40% T/T in advanced, sixty% T/T in opposition to the B/L copy.
Q8: How extended will you get to organize creation?
A8: 380V 50HZ we can supply the products within 7-15 days. Other electrical energy or other color we will shipping and delivery within twenty five-thirty times.
Q9: Can you settle for OEM orders?
A9: Sure, with professional design team, OEM orders are very welcome.
Q10: Which trade phrase can you acknowledge?
A10: Obtainable trade conditions: FOB, CIF, CFR, EXW, CPT, and so on