CZPT Parameter of CZPT
Type | Force ratio | Outlet pressure | Movement 1/Min |
Connections | Web weight KG |
|||
bar | psi | CZPT port | Inlet | Outlet | ||||
OG6 | six:1 | 48 | 696 | 27.seventy four | G1/2” | G3/4” | ZG1/2” | twelve.seven |
OG10 | 10:one | eighty | 1160 | eighteen.5 3 | G1/2” | G3/4” | ZG1/2” | twelve.7 |
OG16 | 16:one | 128 | 1856 | 12.86 | G1/2” | G3/4” | ZG1/2” | twelve.7 |
OG28 | 28:1 | two 24 | 3248 | seven.24 | G1/2” | ZG1/2” | ZG3/8” | 12.2 |
OG40 | forty:one | three twenty | 4640 | 5.02 | G1/2” | ZG1/2” | ZG3/8” | 12.2 |
OG64 | 64:one | 512 | 7424 | three.21 | G1/2” | ZG1/2” | ZG3/8” | 12.two |
OG80 | eighty:1 | 640 | 9280 | two.44 | G1/2” | ZG1/2” | ZG3/8” | twelve.two |
OG100 | 100:1 | 800 | 11600 | one.eighty one | G1/2” | ZG1/2” | M14X1.5 | 12 |
OG130 | a hundred thirty:1 | 1040 | a hundred and fifty eighty | 1.36 | G1/2” | ZG1/2” | M14X1.5 | 12 |
OG175 | 175:1 | 1400 | 20300 | one.14 | G1/2” | ZG1/2” | M14X1.5 | twelve |
OG255 | 255:1 | 2040 | 29580 | .77 | G1/2” | ZG3/8” | M14X1.five | twelve |
OG400 | four hundred:1 | 3200 | 46400 | .fifty one | G1/2” | ZG3/8” | M14X1.5 | twelve |
Item introduction
This series of pump employs single pneumatic non-equilibrium gasoline distributing valves to transfer to and fro immediately. The generate components of the pump are produced of aluminum alloy. These elements are taken care of with oxidation into black to make certain their good-looking look and stainless efficiency.
The fluid getting in touch with elements are produced of carbon metal or stainless steel in accordance to distinct media. The total set of sealing parts is imported, to ensuring pumps’ performances. The diameter of travel piston is 100mm. The optimum generate strain is 10bar. We suggest customers use air pressure≤8bar to ensure prolonged lifespan of the pump.
Primary technological data
Our factory
FAQ
1. Shipping CZPT: FOB HangZhou, by vessel
two. Delivery Time: 15-twenty times
three. Payment CZPTs: T/T (100% to spend by T/T )
4. Installation / Operation / Provider / Guide: In English
5. Guarantee: One 12 months from the day of completion of the commissioning.
6. Pre-shipment Inspection: Supplier need to trial operate complete line at supplier’s manufacturing facility ahead of cargo.
About shipping and delivery
Fumigation wood situations, which are properly sealed and powerful enough for long-term excursion, and appropriate for multi-occasions loading & unloading by forklift.