Solution specifics
Solution Name: CZPT ISO9001 Certification |
Comparision
Parameter
MCZPTL | Optimum Working Force | Free AIR Supply* OF Unit AT Doing work Pressure | MOTOR | Sounds Amount | AIR OUTLET DISCHARGE Dimension | Fat | Proportions | ||||
Bar | PSI | l/s | m3/min | CFM | kW | HP | dBA | (mm) | KG | (mm) | |
MCS-five.5 | 7 | 102 | 14 | .eighty five | thirty | 5.5 | seven.5 | 65±2 | G3/four | 240 | 800 x 720 x 950 |
8 | 116 | 13 | .78 | 28 | |||||||
9 | one hundred forty five | 11 | .65 | 23 | |||||||
10 | 174 | 9 | .fifty five | twenty | |||||||
MCS-seven.5 | seven | 102 | twenty | 1.two | 43 | 7.five | ten | 65±2 | G3/4 | 250 | 800 x 720 x 950 |
8 | 116 | eighteen | one.one | 39 | |||||||
nine | one hundred forty five | fifteen | .9 | 32 | |||||||
10 | 174 | 13 | .seventy five | 27 | |||||||
MCS-11 | 7 | 102 | 28 | one.sixty five | 59 | eleven | 15 | 70±2 | G3/4 | 350 | 950 x 800 x1160 |
eight | 116 | 25 | one.5 | 54 | |||||||
nine | one hundred forty five | 22 | one.three | forty six | |||||||
10 | 174 | 18 | 1.one | 39 | |||||||
MSC-fifteen | seven | 102 | 42 | 2.five | 89 | 15 | 20 | 70±2 | G3/4 | four hundred | 1150x 900 x1380 |
8 | 116 | 38 | 2.3 | 82 | |||||||
ten | a hundred forty five | 35 | 2.1 | seventy five | |||||||
12 | 174 | 32 | one.nine | 68 | |||||||
MCS-eighteen.five | seven | 102 | fifty three | 1.one | 114 | 18.5 | 25 | 72±2 | G1 | 550 | 1150 x 900 x1380 |
8 | 116 | fifty | 2.5 | 107 | |||||||
10 | a hundred forty five | forty five | 2.three | ninety six | |||||||
12 | 174 | 40 | 21 | 86 | |||||||
MCS-22 | 7 | 102 | 63 | 3.8 | 136 | 22 | 30 | 73±2 | G1 | 600 | 1150 x 900 x1380 |
eight | 116 | sixty | 3.6 | 129 | |||||||
ten | one hundred forty five | fifty three | three.2 | 114 | |||||||
twelve | 174 | forty five | two.seven | 96 | |||||||
MCS-30 | seven | 102 | 88 | 5.three | 189 | 30 | 40 | 74±2 | G1 | 650 | 1150 x 900 x1380 |
eight | 116 | 83 | 5 | 179 | |||||||
ten | one hundred forty five | 75 | four.5 | 161 | |||||||
twelve | 174 | 67 | 4 | 143 | |||||||
MCS-37 | seven | 102 | 113 | six.eight | 243 | 37 | fifty | 74±2 | G11/2 | 800 | 1320 x 1000 x1500 |
8 | 116 | 103 | 6.2 | 221 | |||||||
ten | one hundred forty five | 93 | 5.6 | two hundred | |||||||
twelve | 174 | eighty three | 5 | 179 | |||||||
MCS-45 | 7 | 102 | 123 | seven.four | 264 | 45 | 60 | 74±2 | G11/2 | 900 | 1320 x a thousand x1840 |
eight | 116 | 117 | seven | 250 | |||||||
ten | a hundred forty five | 103 | six.2 | 221 | |||||||
twelve | 174 | 93 | five.6 | two hundred | |||||||
MCS-55 | seven | 102 | 167 | 10 | 357 | 55 | 75 | 75±2 | G2 | 1300 | 1600 x 1470 x1460 |
8 | 116 | 153 | nine.two | 329 | |||||||
10 | one hundred forty five | 142 | eight.five | 304 | |||||||
12 | 174 | 127 | 7.6 | 271 | |||||||
MCS-75 | 7 | 102 | 223 | thirteen.4 | 479 | seventy five | 100 | 75±2 | G2 | 1500 | 1800x 1250 x1670 |
eight | 116 | 210 | twelve.six | 450 | |||||||
ten | 145 | 187 | 11.2 | 400 | |||||||
12 | 174 | 167 | ten | 357 | |||||||
MCS-90 | seven | 102 | 268 | sixteen.1 | 575 | ninety | 120 | 75±2 | G2 | 1700 | 1800 x 1250 x1670 |
8 | 116 | 250 | fifteen | 536 | |||||||
10 | one hundred forty five | 230 | thirteen.eight | 493 | |||||||
twelve | 174 | 210 | twelve.six | 450 |
benefits
1. Simple for Servicing, Reduced expense for Maintenance All the pipe and spare areas is CZPTized, they can be modified rapidly. 2. 6000sets capacity for each and every thirty day period. As a single of the biggest Air compressor CZPT, with CZPT CZPT Manufacturing Line, 6000set CZPT can be produced for each and every month. The manufacturing expense is tremendously decreased by the production scale production. Supplying the most expense-successful item for you. 3. Prosperous experience in compressed air program solution, one particular end support and give CZPT program design We can provide one- end answer. We can not only give the CZPT, but also high good quality air therapy gear, this sort of as air tank, air dryer, air filter, air pipe, valves and CZPT spare elements. Help save your time and price greatly. four. Powerful R&D Capacity Once-a-year Rising R&D expenditure. Introduce German GU technological innovation and the Japanese Military technologies. Prolonged- time period collaborative task with HangZhou Jiaotong University. |
Software
Product sales Services
Professional on-line specialist to resolve your concern about compressor technique.
√ Cost-free internet site design expert, and vitality conserving resolution to help you save procedure expense.
√ Negotiable technician accessible to service equipment overseas.
√ On the internet expert right after-support till resolve the problem.
√ 1 yr guarantee soon after commissioning or sixteen months in opposition to shipping date, it relies upon on which one occur to begin with for the entire
machine(other than maintenance consumable).
√ A ample amount of spare parts are available, make sure the very good after support.
Certificate
About CZPT
CZPT CZPT
|
RFQ
Q1. Are you investing organization or manufacture ?
A: We are professional manufacture of screw CZPT much more than eight a long time.
Q2. How extended is the delivery time ?
A: For CZPT voltage ,15 working days. Non-CZPT ,remember to get in touch with our income.
Q3. What’s payment term ?
A: T/T, L/C, D/P, CZPT CZPT, Paypal, Credit score Card, and etc. Also we could settle for USD, RMB, Euro and other forex.
Q4. How about your soon after-income services ?
A: 1.Supply customers with set up and commissioning online recommendations.
two. Nicely-qualified engineers offered to overseas service.
3.Worldwid agents and soon after service avaiable.organize our engineers to assist you training and set up.
Q5. How about your warranty?
A: One particular 12 months for the total machine and two many years for screw air finish, apart from consumable spare parts.
Q6. Do you have any certification ?
A: Sure, per different customer’s industry need ,we can offer CE ,ISO and so on certificate.
Q7. What about the maintenance ?
A: 1st upkeep need to be carried out after 500Hours, and then each 2000-3000 hours to do the typical servicing,
and think about the true atmosphere.
Q8. How do you handle top quality ?
A: 1.Raw- material in checking.
2.Assembly.
3.Worldwid right after services accessible.organize our engineers to assist you education and installation.
Q9. Do you provide OEM service ?
A: Of course.