Emerson Copeland Compressor Air Cooled Scroll Water Chiller

Emerson Copeland Compressor Air Cooled Scroll Water Chiller

one.Software of scroll industrial air cooling water chiller
In air conditioning systems, chilled water is typically distributed to warmth exchangers, or coils, in air handlers or other varieties of terminal units which awesome the air in their respective room(s). The water is then recirculated to the chiller to be recooled. These cooling coils transfer sensible heat and latent heat from the air to the chilled water, hence cooling and generally dehumidifying the air stream.

2.Eurostars CZPT Air CZPT Scroll H2o Chillers Attributes:
–one. Doing work situation ranges from 15C to 43C
–two. Emerson scroll compressor
–3. Drinking water HE: adopt plate type warmth exchanger or tank kind or shell and tube type
–4. CZPT several protections and breakdown self-check out purpose
–5. Adopt multifunction controller(circuit board, Lcd panel, temperature sensors)
CZPT particulars:
–1. CZPT insulation for decreasing sounds(optional)
–two. Cupboard insulation for reducing sounds(optional)
–three. Anti-vibration pad of compressor
–four. CZPT pad of heat exchanger bracket
–5. Every single wire line use various code, easy to fix
–8. Wiring diagram and error code be integrated in handbook, handy to set up and repair

3.Air Cooled Scroll CZPT Drinking water Chiller CZPT Datas

Air Cooled Chiller Unit(commerical type)
Model      ESSA- 05STN 10DTN 12DTN 20QTN 25QTN 20DTN 25DTN
Rated CZPT Capability KW 14 28 34.5 fifty eight.2 66 fifty eight 67
USRT 4. eight. 9.8 sixteen.6 eighteen.8 16.five 19.one
×1000 kcal/h 12. 24.1 29.seven 50.1 fifty six.8 49.nine fifty seven.6
Refrigerant R407C
Evaporator Tank Tube in Shell  Shell and Tube
Condenser Ripple Aluminum Fins around Cooper Pipe
                   
Model      ESSA- 25DTP 40QTN 50QTP 80DTP 100QTP 160QTP
Rated CZPT Capacity KW sixty six 106 a hundred thirty 230 290 460
USRT 18.eight 30.1 37. sixty five.four eighty two.five a hundred thirty.8
×1000 kcal/h fifty six.8 91.two 111.8 197.8 249.four 395.6
Refrigerant R410A R407C R410A
Evaporator Shell and Tube 
Condenser Ripple Aluminum Fins about Cooper Pipe

4.Air Cooled Scroll H2o Chiller Main Elements Introduction
(1)Large Performance Scroll Sort CZPT
—Versatile large-performance scroll compressor, which patent flexible design and style gives best ability of fluid-assault resistance and impurity tolerance.
—Steady compression output guarantee the pulse of air flow to be reduced, with reduced vibration sounds
(2)Large Effectiveness Air Aspect Heat Exchanger
—Special shaped design and style, interior grooved patent sawtooth style and aluminum fin promise productive heat exchange amongst the air side exchanger and ambient air.
(3)Large Efficiency H2o Side Warmth Exchanger
—Tube in shell tank kind: Improve design of equally internal and outer screwed tube, it helps to enhance heating trade performance, and offer much better heating capability. The unique design of liquid refrigerant circulating tube on the bottom of condenser guarantees the heat pump system run easily in serious working issue.
—Brazed-plate evaporator produced from stainless steel functions a brand-new diagonal design to much better use warmth exchanging surfaces.
—Shell and tube evaporator with interior grooved cooper tubes optimizes the cooling and heating efficiency.
Self-cleaning,large intensity,anti-shaking design and warmth insulation masking material guarantee shell and tube heat exchanger unstained,reputable,quiet,highly effective.

(4)Throttling Gadget
Adopt excellent quality CZPT exterior well balanced thermal expansion valve or capillary sort throttling gadget, which is higher trustworthiness and adjustability, can understand precise refrigerant and temperature control to guarantee working in precise and trustworthy standing.
(five)Axial admirer
Adopt CZPT brand axial enthusiast,compact structure,which is accord with aerodynamic rules falciform impeller which can assure it runs with higher efficiency and reduced sounds,also can keep a much better aerodynamic overall performance even under a brief air inlet condition.
(six)Intellectualized Controller
Adopt micro personal computer management, can work through centralized deal with method entire technique can realize remote procedure. The method can monitor the water temperature, capacity position whilst running. The h2o temperature can be managed according to the h2o outlet temperature.

5. EUROSTARS CZPT Air Coooling Scroll Drinking water Chiller Collection

6.About US
We, EUROSTARS, which established in year 2006, is a modern day hi-tech business, specializing in Heating Ventilation Air Conditioning and CZPT CZPT study, development, creation, product sales and engineering companies which be always below to supply following services:
one) Venture method style
2) CZPT support
3) CZPT generation
4) Delivery
5) Installation
6) Test and commissioning
7) Restore and maintenance
8) Following sale support, and many others

7.FAQ
Q: What sort of CZPT help Eurostars can supply?
Ahead of offering
one. Established up consumers file, and set up expert sale engineers to introduce firm items and providers to buyers in element.
two. If buyers are intrigued in our items, we will send specialist specialists to survey the installation environment.
3. Make the answer in accordance to distinct customers’ needs.

Throughout offering
1. CZPT installs and test by qualification engineers.
2. Make sure all the goods we presented are qualified and new. The working life of the main motor is 15-20 years.
3. Build and put in the warmth pump in accordance to countrywide pertinent guidelines strictly, and make certain large top quality shipping on time.
4. Check and debug the equipments strictly to make sure the security and balance.
5. In the course of the supply, give comprehensive and skilled technical education on guidelines and servicing to customers.

Following selling
1. We promise to provide cost-free consulting contact in 7×24 hours manner to resolve the issues located in follow.
2. CZPT promise is 12~eighteen months from ex-factory date. In 18months,if any parts of your products destroyed simply because of top quality, we provide new substitute for cost-free.
three. Right after the expiration of the high quality assurance, we will continue to offer lifelong maintenance solutions, with just charging some expense cost.

eight.Consumer visit us

9.Air cooled h2o chiller delivery or container loading

10. Installation instruction or set up picture, project photographs

A,Location variety of installation Warmth pump
 1). Heat pump should be installed in a large place, and have excellent air flow situation.
 2). Air inlet and outlet must be a clear street, the distance from barrier to inlet and outlet must be more time than 2m.
 3). Established drain ditch or drain outlet, so that can drain drinking water easily.
 4). The installation foundation or bracket have to be firm, make confident warmth pump work balancely.
 5). Make positive heat pump is vertical, cannot be slanted.
 6). Will not put in heat pump at the location in the place there is lots of pollutional and corrosive gas or sand or fallen leaves.
 7). The set up place are unable to be in close proximity to inflammable, flammable factor or hearth.
 8). Installation:
—The installation base can be concrete development, or steel bracket, and must use anti-vibration rubber pad, And the surface need to be easy.
—The design of installation foundation can be in accordance to warmth pump weight.
—The heat pump base must be set by bolt.
B,Pipe link
The drain pipe and overflow pipe need to be set up near drain ditch or drain outlet, straightforward to drain, and set up drain drinking water valve on drain pipe just before magnetic valve there ought to be provider valve on water pipe.
 If use plastic pipe (such as PPR pipe or Stomach muscles pipe), users ought to consider pipe increase and deal issue in between warmth pump and h2o tank.
 Water provide valve and cut-off valve possibly need to have insulation (according to regional temperature condition),stay away from frost crack.
C,H2o pipe method set up
H2o pipe ought to be straight, and the prepare need to be realistic, reduce bend as little as attainable. Reduce the h2o pipe resistance.
There cannot be leaking at any area of pipe.
After all equipments and pipes set up finished, customers ought to test h2o pressure, and drive air out, drain dirty out, make positive drinking water cycle system is  clean. After affirm there is not any issue, then insulate all sizzling drinking water pipes.
D,Electricity offer wiring
 220V heat pump use one period electricity provide, 380V warmth pump use a few phase electricity source, wire line is 3phase 4lines, A B C connects dwell line, N connects null line, E connect earth. Be positive not to connect N line to reside line of electrical power source.
 1).When repairing, remember to switch power supply at “off” facet.
 2).Electricity source connecting method:make positive a equipment power offer is reduce off just before its set up is finished. Put in electrical power supply swap at suitable place, Use rubber gap for wiring line in electrical box.
Electricity source need:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
 3).if power offer fluctuation is out of desire, you should never begin your warmth pump.

 

Emerson Copeland Compressor Air Cooled Scroll Water Chiller