merchandise details |
CZPT Air CZPT Areas Inlet Valve Ingestion Valve
Gives a full variety of application-engineered reciprocating compressor valves that mix the optimum achievable movement efficiency with greatest support lifestyle. with offering a complete line of top quality good quality valves to fulfill most application specifications.
brief introduction of intak valve
CZPT info |
Model | JJ-40L | JJ-50L | JJ-65L | JJ-85L | JJ-120L | JJ-160L |
Nominal Diameter (mm) | forty | fifty | 65 | 85 | 120 | one hundred sixty |
Change | when unloading, pressure in can be modify. | |||||
Management method | 1.Check out valve model 2.Switch model 3.Changing product | |||||
Flange (Φ:mm) | four-Φ9-TKΦ104~Φ116 | 4-Φ17-TKΦ135~Φ150 | 4-Φ17-TKΦ143~Φ170 | four-Φ17-TKΦ160~Φ180 | eight-Φ17-TKΦ210~Φ225 | twelve-Φ18-TKΦ280~Φ295 |
Max Movement (m³/min) | two.five | 5 | 8 | fourteen | twenty five | 46 |
Max force | fifteen(bar) | |||||
Solenoid Valve | AC220V fifty/60HZ (can be customized-manufactured as for every your need to have) | |||||
Air inlet Diameter (mm) | Φ48 | Φ62 | Φ78 | Φ100 | Φ150 | Φ1 |
CZPT scope | ||
CZPT Seal : |
Temperature Sensor | Pressure Sensor |
Servicing Kits | Solenoid Valve | Thermostatic Valve |
Air consumption | Wheel Equipment |
Force Maintaining Valve |
Air CZPT | Oil Separator | Oil CZPT |
Oil Amount Indicator | Circuit Board Grasp Manage | Air intake valve |
Utilized CZPT | Air-stop | Oil stage indicator |
upkeep Service Kit
higher quality compressor parts
oil end valve kit
preventive servicing kit
service kit for
Which includes valve,shaft seal, coupling,drain,drinking water separstor,lubricant
listing of support package
NO | Model | Description | P/N |
one | GA11-22 | Unloading valve kit | 295715711 |
2 | Min pressure valve package | 2957100600 | |
three | Drain valve package | 2957171200 | |
4 | GA30-37-forty five | Drain valve package | 2957121900 |
5 | Min pressure valve package | 2957121800 | |
6 | Examine valve package | 2957121200 | |
seven | Oil end valve package | 2957121700 | |
8 | Unloading valve kit | 2957121100 | |
9 | Thermostat valve package | 1619733300 | |
ten | GA55-75-90C | Oil verify valve package | 2957107200 |
eleven | Examine valve kit | 29571 0571 | |
twelve | Min pressure valve package | 2957121800 | |
13 | Unloading valve package | 2957144800 | |
fourteen | Thermostat valve kit | 2957107400 | |
fifteen | Drain valve kit | 2957184500 | |
sixteen | Drain valve package | 295715710 | |
17 | Oil cease valve kit | 2901108400 | |
18 | Unloading valve kit | 2957129900 | |
19 | GA90-250 | Examination valve package | 29060 0571 |
20 | Oil verify valve package | 2906009400 | |
21 | Min stress valve package | 2906009600 | |
22 | Regulating valve kit | 290605710 | |
23 | Thermostat valve kit | 1619756000 | |
24 | Unloading valve package | 2906 0571 00 | |
25 | Connector package | 290657100 | |
26 | Drain valve package | 2957174900 | |
27 | GA22+ | Unloading valve kit | 2957116100 |
28 | Unloading valve kit | 2957116100 | |
29 | Verify valve package | 2957150301 | |
Oil quit valve kit | 2957121701 | ||
thirty | Min strain valve package | 2901145300 | |
31 | Thermostat valve package | 2901161600 | |
32 | GA37+ | Unloading valve kit | 2901162200 |
33 | Unloading valve package | 2901162200 | |
34 | Check out valve package | 2957150301 | |
35 | Oil quit valve kit | 2901108401 | |
36 | Min force valve package | 2901145300 | |
37 | Thermostat valve package | 2901161600 | |
38 | GA75+ | Unloading valve package | 2901146300 |
39 | Unloading valve kit | 2901146300 | |
40 | Verify valve kit | 2957150301 | |
41 | Oil end valve kit | 2901108401 | |
forty two | Min strain valve package | 2901145300 | |
43 | Thermostat valve package | 1622375980 |
FAQ |
Q1: How can I get the quotation?
A: you can advise us the part quantity for checking, and we will quote to you before long by electronic mail
Q2:What type of approaches for transportation ?
A:In basic by air, sea or Categorical.(like DHL,Fedex,TNT,etc.)
Q3:How do I know the top quality of productions?
A:We have a strict series of top quality management, and we have excellent following service program, which can assist you to resolve the difficulty soon
This autumn: If i want to adjust design,dimension,bundle,and so on. How can I do?
A:You can speak to us by or mail, and we will revise in accordance to your necessity
Q5:What is the phrases of payment ?
A: T/T, CZPT CZPT, paypal(need to have five% paypal payment)
OUR Support |
24 hrs a days, 7 days a week
1-end buying
Competitive price, good quality and productive with best soon after-sale services
We acknowledge your specific buy and do everything we can to satisfy your requirement.
Extra data |
No | Product | Gas displacement m3/min | Energy(kw) | |||
7.5bar | 8.five/8bar | 10bar | 13bar | |||
one | GA5P FM | .9 | .8 | .seven | .5 | 5 |
two | GA7P FM | 1.two | one.1 | one | .eight | 7 |
3 | GA11P FM | 1.7 | one.six | one.5 | 1.2 | 11 |
4 | GXe15P FM | two.fifty eight | 2.36 | 2.eighteen | one.eighty one | fifteen |
five | GXe18P FM | 3.fifteen | three.01 | two.61 | 2.23 | 18 |
six | GXe22P FM | 3.sixty one | three.5 | 3.1 | 2.7 | 22 |
seven | GAe11P | two | one.9 | 1.six | 1.two | 11 |
eight | GAe15P | 2.seven | 2.5 | two.three | one.9 | fifteen |
nine | GAe18P | three.3 | 3.1 | two.seven | two.3 | eighteen |
ten | GAe22P | 3.8 | three.7 | three.three | two.8 | 22 |
eleven | GAe26P | four.three | 4 | three.7 | 3.1 | 26 |
twelve | GAe30P | 4.eight | 4.5 | four.3 | three.7 | 30 |
thirteen | GA11+P | two.1 | two | 1.8 | one.five | 11 |
fourteen | GA15+P | two.8 | 2.6 | 2.four | two | fifteen |
fifteen | GA18+P | three.5 | 3.3 | two.nine | 2.5 | 18 |
sixteen | GA22+P | four.1 | 3.9 | 3.5 | three | 22 |
seventeen | GA26+P | four.8 | four.6 | 4.two | 3.six | 26 |
18 | GA30P | 5.4 | five.2 | four.8 | 4.one | thirty |
19 | GA30+AP | six.one | 6.(8bar) | four.8 | 3.9 | 30 |
20 | GA37AP | six.4 | six.three(8bar) | 5.6 | 4.5 | 37 |
21 | GA37+AP | 7.1 | 6.9(8bar) | five.nine | 4.nine | 37 |
22 | GA45AP | 7.seven | seven.three(8bar) | 6.five | 5.5 | forty five |
23 | GA45+AP | eight.6 | 8.(8bar) | 7.3 | 6.1 | 45 |
24 | GA55AP | 10 | 9.3(8bar) | eight.six | seven.4 | 55 |
25 | GA55+(A/W)P | ten.6 | ten.1(8bar) | 8.7 | ~~~ | fifty five |
26 | GA75AP | 13.one | 12.three(8bar) | 11 | 9.seven | seventy five |
27 | GA75+(A/W)P | fourteen.7 | thirteen.eight(8bar) | twelve.2 | ten.two | 75 |
28 | GA90(A/W)P | sixteen.two | 15.6(8bar) | 14.one | twelve | 90 |
Desk two | ||||||
No | Product | Gasoline displacement m3/min | Energy(kw) | |||
7.5bar | 8.5bar | 10bar | 14bar | |||
1 | GA90-(W) | 16.8 | fifteen.8 | 14.4 | eleven.one | 90 |
two | GA110(W) | 20 | eighteen.eight | 17 | 13.9 | a hundred and ten |
3 | GA132(W) | 24.1 | 22.9 | 21 | 16.eight | 132 |
four | GA160(W) | thirty.4 | 28.nine | 26.eight | 21.7 | 160 |
No | Product | Gasoline displacement m3/min | Power(kw) | |||
7.5bar | 8.5bar | 10bar | 13bar | |||
five | GA200(W) | 36.1 | 34 | 30.seven | 26.1 | two hundred |
6 | GA250(W) | 43.7 | forty one.seven | 37.eight | 31.7 | 250 |
7 | GA315(W) | 55 | 52 | forty eight | 315 | |
eight | GA355(W) | sixty | 57 | 53 | forty six | 355 |
CZPT oil
compressor oil
screw CZPT lubricant oil
lubricant oil 1615594900
lubricant oil
compressor oil
screw CZPT lubricant oil
lubricant oil 1615594900
Outstanding oxidation resistance
Retains the compressor clean on the inside of and stops contaminants from clogging the filter factors.Guarantees highest output in among support in tervals.
Exceptional drinking water separation
Protects in opposition to corrosin and the development of hamful deposits. Stops emulsified drinking water in oil that decreases the stream to lubrication level and encourage damages of the bearings.
Outstanding seal and paint compatibility
Lowers risk of leakage and no require for re-sealing.
Balanced composition on antifoam
Keeps the oil clean and stops blocking of the oil separator, guaranteeing a low oil carry more than.
Prime protection in opposition to dress in
Shields seals, bearings and rotors of the compressor in opposition to adverse outcomes of moisture contamination and acidic assaults.Extends lifetime of transferring parts.five,why us?
one. when the products will be sent?
the delivery will be organized during 1-3 working times after the payment received.
2. what is the payment approach?
T/T (USD account), western union, paypel
3. you are the trade business or factory?
of program we are factory, we merchandise almost all types of CZPT parts including oil free of charge CZPT parts, we even now can rebuild airend.
four.what is the payment term?
one hundred% TT in progress, if the amount out of 30000 USD, so it can be 30% in advance and 70% prior to supply
Package & Delivery |
Deal each product as global packaging CZPT.
Your style package ask for also satisfactory
five,why us?
one. when the products will be sent?
the shipping and delivery will be arranged for the duration of one-3 doing work times after the payment acquired.
two. what’s the payment technique?
T/T (USD account), western union, paypel
3. you are the trade business or factory?
of training course we are manufacturing unit, we solution almost all kinds of CZPT elements such as oil free CZPT elements, we nevertheless can rebuild airend.
4.what is the payment phrase?
one hundred% TT in progress, if the amount out of 30000 USD, so it can be 30% in progress and 70% ahead of shipping and delivery