Sevro CZPT CZPT 22kw 30hp Air compressor CZPTtric CZPTn CZPT Air CZPT Rotary CZPT
Features Of Sevro CZPT CZPT Air CZPT
one. Small, fast motion quick response, huge overload capacity, extensive speed range
2. The low-pace torque, low volatility, secure operation
3. Low noise, substantial effectiveness
four.The rear end of the encoder opinions (optional) constitute a DC servo and many others.
five. swing selection, frequency adjustable
six. The angle of Induction motor is three.6°1.eight, the servo motor is very Control accuracy, the angle is .036°, To obtain a shut-loop handle of place, velocity and torque To defeat the issue of out of phase of Induction motor.
seven. different performance:
The induction motor is Open-loop handle, the very CZPTt Frequency or overload, it easy to Dropped phase or Stall, when stop, the higher velocity will be Overshoot phenomenon. For that reason, in get to make sure its control precision, Ought to manage the acceleration and deceleration problem.
The servo motor is Closed-loop control, The driver sampling right to comments signal of Motor encoder, Internal composition Situation loop and Pace loop, It does not appear Lost phase or Overshoot, There is more reliable control functionality
8. The speed in reaction is various
It require 200 to 400 ms of Induction motor to speed up from standstill to operating velocity. But for servo motor, it only normally takes a number of ms to accelerate pace to 3000 rpm , It can be utilized to management apps that need rapidly begin-stop.
9. comfort: heat and sounds significantly decreased.
Straightforward point that is: The induction motor, it will operating for a while due to the fact of its personal inertia following minimize the energy. But servo motors are end speedily, begin quickly, rapidly reaction
TCEHNICAL Requirements OF THE Direct Driven SCREW AIR CZPT | |||||||||||
Product | AHD-30A | AHD-50A | AHD-75A | AHD-100A | AHD-120A/W | AHD-150A/W | AHD-175A/W | AHD-220A/W | AHD-250A/W | AHD-300A/W | AHD-350A/W |
Free air supply /Discharge strain (m3/min /Mpa) | 3.8/.seven three.6/.eight 3.two/1. two.8/one.2 |
6.eight/.7 six.two/.8 5.6/1. four.9/one.two |
ten./.seven 9.1/.8 8.5/one. seven.six/1.2 |
13.5/.7 12.six/.eight eleven.2/one. ten./one.2 |
sixteen.1/.seven 15./.eight thirteen.eight/1. twelve.three/1.two |
21./.7 19.8/.eight seventeen./one. fifteen.three/1.2 |
twenty five.two/.7 24./.8 21./one. eighteen.three/one.2 |
28.7/.7 27.six/.8 24.six/one. 21.five/1.two |
32./.7 30.five/.eight 27.5/one. 24.eight/1.two |
36.seven/.seven 34.5/.eight thirty.2/1. 27.eight/1.two |
forty two./.seven forty.five/.8 38.one/1. 34.six/one.2 |
No.of compression stage | solitary stage | ||||||||||
Ambient temperature | ‘-5–+45oC | ||||||||||
CZPT product | Air –CZPT | Air-CZPT&Water-CZPT | Water-CZPT | ||||||||
Discharge temperature (0C) | Ambient temperature+15oC | ||||||||||
CZPT(L) | eighteen | thirty | sixty five | 90 | a hundred and ten | ||||||
Sounds amount (Db) | 68±2 | 72±2 | 75±2 | 72±2 | |||||||
CZPT approach | Direct drive | ||||||||||
CZPTtricity (V/ph/Hz) | 380/3/50 | ||||||||||
Electricity (KW/HP) | 22/30 | 37/fifty | fifty five/seventy five | seventy five/a hundred | ninety/one hundred twenty | a hundred and ten/one hundred fifty | 132/a hundred seventy five | 150/200 | 185/250 | 220/three hundred | 250/350 |
CZPTting method | Y-ΔCZPTter | ||||||||||
Dimension: duration/ width/ height (mm) |
1400* 900* 1220 |
1400* 900* 1220 |
1800* 1200* 1600 |
1900* 1200* 1600 |
2100* 1400* 1780 |
2360* 1360* 1800 |
2460* 1420* 1800 |
2560* 1540* 1840 |
2610* 1640* 2050 |
2700* 1740* 2100 |
2900* 1850* 2200 |
Weight(kg) | 680 | 1060 | 1880 | 1980 | 2100 | 2900 | 3500 | 3900 | 4200 | 4600 | 5000 |
Air outlet pipe diameter (inch/mm) | one” | one one/2″ | 2″ | DN65 | DN80 | DN100 |
Software
• Our merchandise are broadly utilised in electricity era, semiconductor, shipbuilding, oil area, rubber, meals, pharmacy, package, electronic, interaction, cement, eyeglasses, chemical, textile, papermaking, gasoline, and oil refining, etc.
Our Factory
Business Overview
HangZhou CZPT CZPT Co., Ltd.
• Skilled maker of CZPT program tools
• Primary products consist of CZPT Air CZPT & Piston Air CZPT
• Chopping-edge technology & leading techniques: CZPT German air conclude with SKF bearing, Siemens/ABB electricity technique and spare elements of other globe-CZPT manufacturers. To ensure dependability, large efficiency, reduced sounds and prolonged daily life span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Particulars: CZPT crate pallet plus foam board and bubble movie, Total closed wooden circumstance. 1pcs/every package (for stationary screw CZPT)
• CZPT method: by sea, by LCL/FCL or as asked for
• Delivery technique: FOB, CFR, CIF and EXW etc.
• Shipping and delivery time: in seven-15 days after acquiring deposit (CZPT devices not incorporated)
Our Support
Soon after-sale Service
• Any questions or requests prior to, during or following product sales, we would like to help you any time and will find you the best resolution in 24 hours.
• Guarantee: 1 yr for the complete device CZPT spare elements will be offered with greatest price.
• Over board engineer support is accessible.
Special CZPT Service
1) Total OEM
• Amount: at the very least 5 pcs
• In this prepare, we will do all the changes (Color, name plate and emblem) as your want, and will not demand further fee.
2) Half OEM
• Amount: no limit
• Underneath this system, we can make the needed alteration (identify plate and emblem) but we will demand some further charge for the identify plate, as the name plate factory has the MOQ.
3) Emblem OEM
• Quantity: no limit
• Only the symbol will be altered to yours, and no extra price will be billed.
Overseas Engineer Provider
• We are available to deliver our engineer for aboard services. Only require you to arrange the lodging, transportation and translator. Added expense for each and every will be discussed based on nearby price tag level.
FAQ
Q1: Are you manufacturing unit or trade organization?
A1: We are manufacturing unit.
Q2: What the exactly handle of your manufacturing facility?
A2: Our business is found in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Warranty conditions of your equipment?
A3: One particular 12 months warranty for the equipment and specialized assist according to your needs.
This fall: Will you give some spare areas of the devices?
A4: Indeed, of training course.
Q5: What about merchandise package?
A5: We pack our products strictly with CZPT seaworthy case.
Q6: What about the voltage of products?
Can they be CZPT? A6: Indeed, of system. The voltage CZPT according to your equirement.
Q7: Which payment phrase can you settle for?
A7: 40% T/T in superior, sixty% T/T from the B/L duplicate.
Q8: How extended will you just take to arrange generation?
A8: 380V 50HZ we can delivery the merchandise inside seven-15 days. Other electrical power or other colour we will shipping and delivery inside 25-thirty days.
Q9: Can you settle for OEM orders?
A9: Indeed, with skilled layout crew, OEM orders are highly welcome.
Q10: Which trade time period can you accept?
A10: Accessible trade conditions: FOB, CIF, CFR, EXW, CPT, and many others