Technical Knowledge of Immediate CZPT CZPTtric Motor CZPT Air CZPTs
Model | Functioning Force | Capacity | Motor Electrical power | CZPTn Technique | CZPT Technique | Dimension(mm) | Web Fat | Air Outlet Pipe Diameter | ||||
Psi | bar | Cfm | m3/min | kw/hp | L | W | H | KGS | ||||
SGD08 | 102 | seven | 42.four | one.2 | 7.five/ten | Direct CZPT | Air CZPT / Drinking water CZPT |
900 | 670 | 850 | two hundred | one/2” |
116 | 8 | 38.eight | 1.1 | |||||||||
one hundred forty five | ten | 33.five | .95 | |||||||||
174 | 12 | 28.3 | .8 | |||||||||
SGD11 | 102 | seven | 58.three | one.65 | 11/fifteen | 1080 | 750 | 1571 | 280 | 3/4” | ||
116 | 8 | fifty three. | one.5 | |||||||||
one hundred forty five | ten | 45.nine | 1.3 | |||||||||
174 | twelve | 38.eight | 1.one | |||||||||
SGD15 | 102 | seven | 88.3 | two.5 | 15/twenty | 1080 | 750 | 1571 | 300 | 3/4” | ||
116 | eight | eighty one.2 | 2.3 | |||||||||
145 | ten | 74.2 | 2.1 | |||||||||
174 | 12 | 67.1 | one.nine | |||||||||
SGD18 | 102 | 7 | 113. | three.2 | 18.five/twenty five | 1380 | 850 | 1185 | 430 | 1” | ||
116 | 8 | one zero five.9 | 3. | |||||||||
a hundred forty five | 10 | ninety five.three | 2.seven | |||||||||
174 | 12 | 84.seven | 2.four | |||||||||
SGD22 | one hundred | 7 | 134.two | three.8 | 22/30 | 1380 | 850 | 1185 | 450 | 1” | ||
116 | eight | 127.1 | 3.6 | |||||||||
145 | 10 | 113. | three.two | |||||||||
174 | twelve | 95.three | 2.seven | |||||||||
SGD30 | 102 | seven | 187.1 | five.3 | thirty/forty | 1380 | 850 | 1185 | five hundred | 1” | ||
116 | 8 | 176.six | five. | |||||||||
a hundred forty five | 10 | 158.nine | four.5 | |||||||||
174 | twelve | 141.2 | 4. | |||||||||
SGD37 | 102 | 7 | 240.one | 6.eight | 37/fifty | 1500 | one thousand | 1345 | 650 | 11/two” | ||
116 | 8 | 218.nine | six.2 | |||||||||
145 | ten | 197.7 | five.6 | |||||||||
174 | twelve | 176.6 | five. | |||||||||
SGD45 | 102 | 7 | 261.three | 7.four | forty five/sixty | 1500 | 1000 | 1345 | 680 | 11/2″ | ||
116 | eight | 247.2 | 7. | |||||||||
one hundred forty five | 10 | 218.9 | six.two | |||||||||
174 | twelve | 197.seven | 5.6 | |||||||||
SGD55 | 102 | seven | 353.1 | ten. | 55/75 | 1800 | 1250 | 1670 | 1150 | 2″ | ||
116 | eight | 339. | 9.six | |||||||||
a hundred forty five | ten | three hundred.1 | 8.5 | |||||||||
174 | 12 | 268.4 | seven.six | |||||||||
SGD75 | 102 | seven | 473.2 | 13.four | seventy five/100 | 1800 | 1250 | 1670 | 1200 | 2″ | ||
116 | eight | 444.nine | 12.6 | |||||||||
one hundred forty five | 10 | 395.5 | 11.two | |||||||||
174 | 12 | 353.1 | ten. | |||||||||
SGD90 | 102 | seven | 572. | sixteen.two | ninety/a hundred and twenty | 1800 | 1250 | 1670 | 1350 | two” | ||
116 | 8 | 529.seven | 15. | |||||||||
a hundred forty five | ten | 487.3 | thirteen.8 | |||||||||
174 | twelve | 434.three | twelve.3 | |||||||||
SGD110 | 102 | seven | 741.5 | 21. | one hundred ten/one hundred fifty | 2300 | 1470 | 1840 | 1800 | two one/2” | ||
116 | eight | 699.1 | 19.8 | |||||||||
145 | 10 | 614.4 | seventeen.4 | |||||||||
174 | 12 | 522.6 | 14.8 | |||||||||
SGD132 | 102 | seven | 865.one | 24.five | 132/a hundred seventy five | 2300 | 1470 | 1840 | 1850 | two one/2” | ||
116 | eight | 819.two | 23.two | |||||||||
a hundred forty five | ten | 723.nine | twenty.five | |||||||||
174 | 12 | 614.four | seventeen.4 | |||||||||
SGD160 | 102 | 7 | 1013.four | 28.7 | 160/200 | 2300 | 1470 | 1840 | 2000 | two 1/2” | ||
116 | 8 | 974.6 | 27.six | |||||||||
145 | 10 | 868.6 | 24.six | |||||||||
174 | twelve | 759.two | 21.five | |||||||||
SGD185 | 102 | seven | 1129.9 | 32. | 185/250 | 3150 | 1980 | 2152 | 3500 | DN85 | ||
116 | eight | 1073.four | 30.four | |||||||||
a hundred forty five | ten | 967.5 | 27.4 | |||||||||
174 | 12 | 875.7 | 24.8 | |||||||||
SGD220 | 102 | seven | 1271.two | 36. | 220/three hundred | 3150 | 1980 | 2152 | 3800 | DN85 | ||
116 | eight | 1211.1 | 34.3 | |||||||||
a hundred forty five | 10 | 1066.four | 30.2 | |||||||||
174 | twelve | 978.1 | 27.7 | |||||||||
SGD250 | 102 | 7 | 1483. | 42. | 250/350 | 3150 | 1980 | 2152 | 4000 | DN85 | ||
116 | eight | 1430.one | forty.5 | |||||||||
145 | ten | 1348.eight | 38.two | |||||||||
174 | twelve | 1218.two | 34.five | |||||||||
SGD315 | 102 | 7 | 1800.eight | 51. | 315/430 | 4000 | 1980 | 2152 | 6000 | DN110 | ||
116 | eight | 1772.six | 50.2 | |||||||||
one hundred forty five | ten | 1571.3 | 44.5 | |||||||||
174 | 12 | 1412.4 | 40. | |||||||||
SGD355 | 102 | seven | 2259.8 | 64. | 355/480 | 4000 | 1980 | 2152 | 6500 | DN110 | ||
116 | 8 | 2153.nine | sixty one. | |||||||||
a hundred forty five | ten | 1995. | fifty six.five | |||||||||
174 | 12 | 1730.2 | 49. | |||||||||
CZPTting Manner: Y-△ Motor CZPT Course: IP23/IP54/IP55 or as per your required Voltage: 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests. |
Q1: What is the rotor pace for the air conclude?
A1: 2980rmp.
Q2: What’s your lead time?
A2: usually, 5-7 days. (OEM orders: 15days)
Q3: Can you offer water cooled CZPT?
A3: Yes, we can (normally, air cooled kind).
This fall: What’s the payment term?
A4: T/T, L/C, CZPT CZPT, etc. Also we could accept USD, RMB, and other currency.
Q5: Do you accept CZPT voltage?
A5: Yes. 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests.
Q6: What is your guarantee for CZPT?
A6: One year for the whole CZPT(not like the use spare areas) and technical supports can be supplied according to your requirements.
Q7: Can you take OEM orders?
A7: Sure, OEM orders are warmly welcome.
Q8: How about your customer service and after-sales service?
A8: 24hrs on-line support, 48hrs problem solved promise.
Q9: Do you have spare parts in stock?
A9: Yes, we do.
Q10: What kind of initial lubrication oil you used in CZPT?
A10: TOTAL 46# mineral oil.