Aggressive Charges Rotary CZPT Air CZPT for Sale
Product Description
Attributes Of Immediate CZPTn CZPT Air CZPT
1 . Air stop with substantial-effectiveness
2. Double CZPT with reduced noise, Tremendous Silenced Enclosure
three. Stylish compact style. Fully open entry doorway to inner components for effortless support.
4. one hundred% Continuous obligation operation. Load/No Load procedure
5. Large high quality CE Certification industrial electrical motors. ISO,CE,UL Certificate
six. Simple to use and study Liquid crystal display control panel
seven. Higher temperature, higher pressure and anti-rotation shutdown
eight. CZPT effective procedure
nine. 5 micron, water-resistant air filtration content
10. 1year total equipment warranty,3years air finish warranty.
eleven. CZPT the device with distinct functioning voltage in accordance to customer’s ask for,
this sort of as: 380Volt,3phase,50hz
420Volt,3phase,50hz
380Volt,3phase,60hz
220Volt,3phase and 60hz, etc.
Specs of Belt CZPTn of CZPT Air CZPT
CZPT CZPT Air CZPT (Belt driven) | ||||||||||||
Model | AHB-5A | AHB-7A | AHB-10A | AHB-15A | AHB-20A | AHB-25A | AHB-30A | AHB-40A | AHB-50A | AHB-60A | AHB-75A | AHB-100A |
Cost-free air provide/ Discharge strain (m3/min/Mpa) |
.fifty five/.eight | .85/.7 .75/.eight |
one.2/.7 one.1/.8 .nine/one. .seven/one.2 |
one.six/.7 one.five/.eight one.three/1. 1.1/1.two |
two.five/.7 two.three/.eight two.one/1. one.nine/1.2 |
three.two/.7 two.nine/.8 2.6/one. 2.2/1.two |
3.eight/.7 three.6/.8 three.two/one. 2.8/1.two |
5.two/.seven 5./.eight 4.5/one. three.eight/one.2 |
six.8/.7 6.2/.8 5.6/one. four.9/1.2 |
7.3/.seven 7./.eight 6./one. five.six/1.two |
ten./.7 nine.one/.eight 8.5/one. seven.6/one.2 |
13.5/.seven 12.6/.8 eleven.2/one. 10./one.two |
Free air produce /Discharge stress (CFM/PSI) |
twenty/116 | 30/102 27/116 |
42/102 39116 32/145 twenty five/174 |
fifty seven/102 53/116 forty six/one hundred forty five 39/174 |
88/102 81/116 74/145 sixty seven/174 |
113/102 102/116 ninety two/145 78/174 |
134/102 127/116 113/one hundred forty five 99/174 |
184/102 177/116 159/one hundred forty five 134/174 |
240/102 219/116 198/a hundred forty five 173/174 |
258/102 247/116 212/one hundred forty five 198/174 |
353/102 322/116 300/one hundred forty five 269/174 |
477/102 445/116 396/a hundred forty five 353/174 |
Compression phase |
Single phase | |||||||||||
Ambient temprerature |
-5–+45ºC | |||||||||||
CZPT method | Air cooling | |||||||||||
Discharge temperature (0C) |
Ambient temperature+15ºC | |||||||||||
CZPT (L) | 3 | three.seven | 3.7 | 10 | ten | fourteen.five | fourteen.5 | 15 | 20 | twenty | forty five | forty five |
Sounds Amount(Db) | 62±2 | 64±2 | 65±2 | 66±2 | 68±2 | |||||||
CZPT technique | Belt pushed | |||||||||||
CZPTtricity (V/ph/Hz) |
380V/3PHASE/50HZ | |||||||||||
Motor power (KW/HP) |
4/five.five | five.5/7.5 | seven.five/ten | 11/15 | 15/twenty | 18.five/25 | 22/30 | thirty/40 | 37/fifty | 45/60 | fifty five/seventy five | 75/a hundred |
CZPTting approach | immediate beginning | Y-△CZPTter (CZPT delta beginning) | ||||||||||
Dimension L*W*H (mm) |
920* 600* 695 |
800* 650* 880 |
860* 730* 960 |
940* 800* 1075 |
1200* 950* 1150 |
1400* 930* 1280 |
1500* 990* 1420 |
1730* 1050* 1550 |
1730* 1070* 1650 |
|||
Net Weight (kg) |
one hundred thirty five | 210 | 223 | 315 | 325 | 455 | 491 | 566 | 695 | 745 | 1090 | 1240 |
Air outlet diameter (inch/mm) |
3/4” | 1” | 11/2” | 2” |
Application
• Our items are commonly employed in electrical power technology, semiconductor, shipbuilding, oil subject, rubber, food, pharmacy, bundle, electronic, communication, cement, eyeglasses, chemical, textile, papermaking, gasoline, and oil refining, etc.
Merchandise show
Firm details
HangZhou CZPT CZPT Co., Ltd.
• Professional producer of CZPT system tools
• Major goods include CZPT Air CZPT & Piston Air CZPT
• Slicing-edge engineering & leading techniques: CZPT German air conclude with SKF bearing, Siemens/ABB electrical power program and spare parts of other entire world-CZPT brands. To make sure reliability, high performance, minimal sounds and prolonged life span.
We have received the acceptance of ISO9001-2000 global good quality administration method, ISO14001 setting management system authentication, CE quality system, UL high quality technique, ASME high quality method and so on.
CZPT, shipping and delivery and payment
• Packing Specifics: CZPT crate pallet plus foam board and bubble movie, Entire shut wood situation. 1pcs/every single package (for stationary screw CZPT)
• CZPT technique: by sea, by LCL/FCL or as asked for
• Shipping technique: FOB, CFR, CIF and EXW and so on.
• Delivery time: in 7-15 days soon after receiving deposit (CZPT equipment not incorporated)
Our Provider
Soon after-sale Service
• Any inquiries or requests prior to, during or after sales, we would like to help you any time and will locate you the greatest solution in 24 hours.
• Guarantee: A single 12 months for the entire equipment CZPT spare parts will be offered with best price.
• In excess of board engineer provider is offered.
Specific CZPT Service
1) Entire OEM
• Amount: at least 5 pcs
• In this plan, we will do all the alterations (Coloration, identify plate and symbol) as your need to have, and will not charge added charge.
2) Fifty percent OEM
• Amount: no restrict
• Below this program, we can make the needed alteration (title plate and brand) but we will charge some added payment for the title plate, as the title plate factory has the MOQ.
three) Emblem OEM
• Quantity: no limit
• Only the symbol will be modified to yours, and no further charge will be charged.
Overseas Engineer Support
• We are available to deliver our engineer for aboard support. Only need you to set up the lodging, transportation and translator. Further price for every single will be discussed based on local value amount.
FAQ
Q1: Are you manufacturing unit or trade organization?
A1: We are manufacturing unit.
Q2: What the specifically handle of your manufacturing unit?
A2: Our company is situated in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Guarantee conditions of your device?
A3: One particular year warranty for the machine and technological assist according to your wants.
This fall: Will you offer some spare elements of the devices?
A4: Of course, of training course.
Q5: What about merchandise deal?
A5: We pack our merchandise strictly with CZPT seaworthy situation.
Q6: What about the voltage of items?
Can they be CZPT? A6: Indeed, of training course. The voltage CZPT in accordance to your equirement.
Q7: Which payment time period can you take?
A7: forty% T/T in superior, 60% T/T towards the B/L duplicate.
Q8: How prolonged will you just take to set up creation?
A8: 380V 50HZ we can shipping the merchandise inside of seven-15 times. Other electricity or other shade we will shipping and delivery inside of 25-thirty times.
Q9: Can you accept OEM orders?
A9: Of course, with professional design crew, OEM orders are extremely welcome.
Q10: Which trade time period can you acknowledge?
A10: Available trade phrases: FOB, CIF, CFR, EXW, CPT, and many others.
Contact us
For far more info, remember to speak to us straight
HangZhou CZPT CZPT Co.,Ltd
Place of work tackle: Area 608-610,Lida plaza,No.611 CZPTn highway,CZPT district,HangZhou China
Factory address: CZPT CZPT park, CZPT District, HangZhou, China
Fax: twenty-38090400
Tel: 13610033927
Website:http: //
Contact man or woman: Candy huang