Manufacturing facility offer 37kw/50hp rotary blower equipment
Solution Information
Attributes Of Belt CZPTn CZPT Air CZPT
1 . Air end with higher-effectiveness
two. Double CZPT with low sound, Super Silenced Enclosure
3. Sophisticated compact style. Entirely open accessibility door to interior elements for simple services.
4. one hundred% Continuous responsibility operation. Load/No Load operation
5. Substantial quality CE Certification industrial electrical motors. ISO,CE,UL Certification
6. Effortless to use and study Liquid crystal display management panel
7. High temperature, large strain and anti-rotation shutdown
eight. CZPT effective operation
nine. 5 micron, drinking water-resistant air filtration materials
10. 1year complete device warranty,3years air conclude guarantee.
eleven. CZPT the equipment with distinct operating voltage according to customer’s ask for,
such as: 380Volt,3phase,50hz
420Volt,3phase,50hz
380Volt,3phase,60hz
220Volt,3phase and 60hz, etc.
AIRHORSE SCREW AIR CZPT (BELT Pushed) | |||||||||||
Design | AHB-7A | AHB-10A | AHB-15A | AHB-20A | AHB-25A | AHB-30A | AHB-40A | AHB-50A | AHB-60A | AHB-75A | AHB-100A |
Free of charge air produce/ Discharge force (m3/min/Mpa) |
.eighty five/.7 .75/.eight |
one.two/.seven one.one/.eight .9/1. .seven/1.2 |
1.six/.7 one.5/.8 one.three/one. 1.one/one.2 |
two.five/.7 2.three/.8 two.1/one. 1.nine/1.two |
three.two/.7 2.nine/.8 two.6/1. 2.2/1.2 |
three.eight/.seven 3.six/.8 three.2/one. two.8/1.two |
5.2/.seven five./.eight four.5/1. three.8/one.2 |
6.8/.7 6.2/.8 five.6/1. four.9/1.two |
seven.3/.7 7./.8 6./1. five.6/one.2 |
ten./.seven nine.one/.eight 8.five/one. seven.six/1.two |
13.5/.7 twelve.six/.eight 11.two/one. 10./one.two |
Cost-free air produce/ Discharge stress (CFM/PSI) |
thirty/102 27/116 |
42/102 39116 32/one hundred forty five 25/174 |
fifty seven/102 53/116 forty six/145 39/174 |
88/102 81/116 seventy four/145 sixty seven/174 |
113/102 102/116 92/145 seventy eight/174 |
134/102 127/116 113/a hundred forty five 99/174 |
184/102 177/116 159/a hundred forty five 134/174 |
240/102 219/116 198/one hundred forty five 173/174 |
258/102 247/116 212/one hundred forty five 198/174 |
353/102 322/116 300/a hundred forty five 269/174 |
477/102 445/116 396/145 353/174 |
No.of compression stage |
single phase | ||||||||||
Ambient temperature | -five–+45°c | ||||||||||
CZPT product | Air –CZPT | ||||||||||
Discharge temperature (°c) |
Ambient temperature+15°c | ||||||||||
CZPT(L) | sixteen | eighteen | thirty | sixty five | |||||||
Sounds degree(Db) | 62±2 | 64±2 | 62±2 | 68±2 | 72±2 | ||||||
CZPT approach | Multivee belt | ||||||||||
CZPTtricity (V/ph/Hz) |
380/3/fifty | ||||||||||
Electricity (KW/HP) |
five.five/seven | seven.5/ten | eleven/15 | 15/twenty | eighteen.5/25 | 22/thirty | thirty/40 | 37/fifty | forty five/sixty | 55/seventy five | seventy five/one hundred |
CZPTting approach | Y-ΔCZPTter | ||||||||||
Dimension: size/ width/ peak(mm) |
800* 720* 950 |
860* 740* 960 |
1100* 850* 1160 |
1400* 950* 1300 |
1500* one thousand* 1420 |
1730* 1170* 1700 |
1820* 1250* 1760 |
||||
Weight(kg) | 128 | 240 | four hundred | 420 | 600 | 620 | 680 | 980 | 1050 | 1600 | 1800 |
Air outlet pipe diameter (inch/mm) |
3/4″ | 1″ | one one/2″ | 2″ |
Software
• Our items are broadly employed in electricity generation, semiconductor, shipbuilding, oil field, rubber, foodstuff, pharmacy, package, digital, communication, cement, glasses, chemical, textile, papermaking, gasoline, and oil refining, and many others.
Our Factory
Company Overview
HangZhou CZPT CZPT Co., Ltd.
• Expert producer of CZPT method tools
• Primary goods consist of CZPT Air CZPT & Piston Air CZPT
• Slicing-edge technologies & leading methods: CZPT German air stop with SKF bearing, Siemens/ABB electricity method and spare elements of other world-CZPT makes. To guarantee reliability, substantial efficiency, lower sounds and lengthy daily life span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Specifics: CZPT crate pallet in addition foam board and bubble film, Entire closed wood circumstance. 1pcs/each package (for stationary screw CZPT)
• CZPT strategy: by sea, by LCL/FCL or as requested
• Shipping and delivery approach: FOB, CFR, CIF and EXW and many others.
• Supply time: in 7-15 days soon after getting deposit (CZPT machines not integrated)
Our Support
After-sale Provider
• Any concerns or requests ahead of, throughout or after income, we would like to support you any time and will discover you the very best solution in 24 hours.
• Guarantee: A single calendar year for the whole machine CZPT spare components will be offered with best value.
• Over board engineer support is accessible.
Special CZPT Provider
one) Total OEM
• Quantity: at minimum 5 pcs
• In this strategy, we will do all the alterations (Colour, name plate and symbol) as your require, and will not charge added payment.
2) Fifty percent OEM
• Quantity: no restrict
• Underneath this software, we can make the needed alteration (title plate and emblem) but we will cost some extra price for the identify plate, as the title plate factory has the MOQ.
three) Symbol OEM
• Quantity: no limit
• Only the brand will be changed to yours, and no extra fee will be charged.
Abroad Engineer Support
• We are accessible to deliver our engineer for aboard services. Only need you to prepare the lodging, transportation and translator. Extra expense for each will be reviewed primarily based on neighborhood cost degree.
FAQ
Q1: Are you manufacturing facility or trade firm?
A1: We are manufacturing facility.
Q2: What the precisely address of your factory?
A2: Our firm is situated in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Warranty terms of your device?
A3: A single yr guarantee for the machine and specialized assist according to your needs.
Q4: Will you give some spare areas of the machines?
A4: Indeed, of program.
Q5: What about merchandise package?
A5: We pack our items strictly with CZPT seaworthy case.
Q6: What about the voltage of items?
Can they be CZPT? A6: Yes, of course. The voltage CZPT according to your equirement.
Q7: Which payment term can you settle for?
A7: 40% T/T in advanced, 60% T/T against the B/L duplicate.
Q8: How extended will you just take to organize creation?
A8: 380V 50HZ we can supply the items inside seven-fifteen times. Other electricity or other shade we will supply inside of twenty five-30 days.
Q9: Can you settle for OEM orders?
A9: Of course, with expert design crew, OEM orders are hugely welcome.
Q10: Which trade expression can you settle for?
A10: Offered trade terms: FOB, CIF, CFR, EXW, CPT, etc