Emerson Copeland Compressor Air Cooled Scroll Water Chiller

Emerson Copeland Compressor Air Cooled Scroll Water Chiller

1.Application of scroll professional air cooling water chiller
In air conditioning systems, chilled water is typically dispersed to heat exchangers, or coils, in air handlers or other kinds of terminal devices which amazing the air in their respective place(s). The drinking water is then recirculated to the chiller to be recooled. These cooling coils transfer sensible heat and latent heat from the air to the chilled drinking water, hence cooling and typically dehumidifying the air stream.

2.Eurostars CZPT Air CZPT Scroll Drinking water Chillers Characteristics:
–one. Operating condition ranges from 15C to 43C
–two. Emerson scroll compressor
–three. Water HE: undertake plate type heat exchanger or tank sort or shell and tube type
–four. CZPT several protections and breakdown self-examine purpose
–5. Undertake multifunction controller(circuit board, Lcd panel, temperature sensors)
CZPT details:
–one. CZPT insulation for decreasing sound(optional)
–2. Cabinet insulation for decreasing noise(optional)
–3. Anti-vibration pad of compressor
–4. CZPT pad of warmth exchanger bracket
–5. Each wire line use distinct code, easy to restore
–eight. Wiring diagram and mistake code be provided in manual, practical to put in and fix

3.Air Cooled Scroll CZPT Water Chiller CZPT Datas

Air Cooled Chiller Unit(commerical type)
Model      ESSA- 05STN 10DTN 12DTN 20QTN 25QTN 20DTN 25DTN
Rated CZPT Capacity KW 14 28 34.five 58.two sixty six 58 sixty seven
USRT 4. eight. 9.eight sixteen.six 18.eight 16.5 19.1
×1000 kcal/h 12. 24.1 29.seven 50.one 56.eight 49.nine fifty seven.six
Refrigerant R407C
Evaporator Tank Tube in Shell  Shell and Tube
Condenser Ripple Aluminum Fins all around Cooper Pipe
                   
Model      ESSA- 25DTP 40QTN 50QTP 80DTP 100QTP 160QTP
Rated CZPT Capability KW 66 106 one hundred thirty 230 290 460
USRT 18.8 thirty.one 37. 65.four eighty two.five 130.8
×1000 kcal/h 56.eight ninety one.2 111.8 197.eight 249.four 395.6
Refrigerant R410A R407C R410A
Evaporator Shell and Tube 
Condenser Ripple Aluminum Fins about Cooper Pipe

4.Air Cooled Scroll Water Chiller Primary Components Introduction
(1)Higher Efficiency Scroll Variety CZPT
—Versatile large-performance scroll compressor, which patent versatile style supplies ideal capacity of fluid-attack resistance and impurity tolerance.
—Constant compression output guarantee the pulse of air stream to be reduced, with reduced vibration noise
(two)High Effectiveness Air Side Heat Exchanger
—Special shaped style, inner grooved patent sawtooth design and style and aluminum fin promise productive heat exchange in between the air aspect exchanger and ambient air.
(three)Large Effectiveness Water Side Warmth Exchanger
—Tube in shell tank type: Enhance design of the two interior and outer screwed tube, it aids to improve heating exchange efficiency, and supply far better heating ability. The particular style of liquid refrigerant circulating tube on the bottom of condenser assures the warmth pump method run effortlessly in extreme functioning issue.
—Brazed-plate evaporator created from stainless steel attributes a brand-new diagonal style to much better use heat exchanging surfaces.
—Shell and tube evaporator with internal grooved cooper tubes optimizes the cooling and heating efficiency.
Self-cleaning,high depth,anti-shaking style and heat insulation masking substance make sure shell and tube warmth exchanger unstained,dependable,silent,highly productive.

(4)Throttling System
Adopt outstanding high quality CZPT exterior balanced thermal growth valve or capillary variety throttling device, which is high dependability and adjustability, can comprehend exact refrigerant and temperature management to make sure operating in precise and dependable position.
(five)Axial supporter
Undertake CZPT model axial enthusiast,compact framework,which is accord with aerodynamic rules falciform impeller which can guarantee it runs with high performance and minimal noise,also can hold a far better aerodynamic functionality even beneath a brief air inlet situation.
(6)Intellectualized Controller
Adopt micro laptop management, can function by way of centralized handle system entire technique can realize distant operation. The system can keep an eye on the drinking water temperature, ability standing although operating. The water temperature can be controlled in accordance to the h2o outlet temperature.

five. EUROSTARS CZPT Air Coooling Scroll Drinking water Chiller Series

six.About US
We, EUROSTARS, which proven in year 2006, is a contemporary hello-tech business, specializing in Heating Air flow Air Conditioning and CZPT CZPT study, growth, generation, product sales and engineering companies which be constantly here to offer adhering to service:
1) Project technique style
two) CZPT assistance
three) CZPT manufacturing
4) Delivery
five) Installation
six) Test and commissioning
7) Repair and routine maintenance
8) Soon after sale support, and many others

7.FAQ
Q: What type of CZPT support Eurostars can offer?
Prior to promoting
1. Established up clients file, and prepare skilled sale engineers to introduce organization merchandise and providers to buyers in detail.
2. If consumers are fascinated in our goods, we will send specialist technicians to survey the set up surroundings.
3. Make the remedy according to various customers’ needs.

For the duration of marketing
one. CZPT installs and check by qualification engineers.
2. Ensure all the products we provided are certified and new. The operating existence of the main engine is fifteen-20 years.
3. Construct and set up the heat pump in accordance to national related insurance policies strictly, and make sure high quality shipping and delivery on time.
4. Examination and debug the equipments strictly to make sure the basic safety and balance.
five. In the course of the shipping, give extensive and expert technological training on instructions and maintenance to consumers.

Soon after promoting
one. We guarantee to offer free of charge consulting phone in 7×24 hrs mode to fix the problems discovered in exercise.
2. CZPT ensure is 12~18 months from ex-manufacturing unit date. Inside of 18months,if any components of your merchandise damaged due to the fact of quality, we provide new substitution for free.
3. After the expiration of the quality assurance, we will keep on to supply lifelong upkeep services, with just charging some cost cost.

8.Buyer go to us

nine.Air cooled water chiller shipping and delivery or container loading

ten. Set up instruction or set up photograph, venture images

A,Area variety of installation Heat pump
 1). Warmth pump need to be set up in a large space, and have very good air circulation problem.
 2). Air inlet and outlet must be a clear street, the length from barrier to inlet and outlet have to be for a longer time than 2m.
 3). Set drain ditch or drain outlet, so that can drain h2o very easily.
 4). The set up foundation or bracket need to be company, make confident warmth pump perform balancely.
 5). Make certain heat pump is vertical, can’t be slanted.
 6). Never install warmth pump at the spot in in which there is loads of pollutional and corrosive gas or sand or fallen leaves.
 7). The installation area are unable to be near inflammable, flammable factor or fire.
 8). Set up:
—The installation foundation can be concrete construction, or steel bracket, and should use anti-vibration rubber pad, And the floor must be smooth.
—The layout of set up base can be according to warmth pump bodyweight.
—The warmth pump base need to be fixed by bolt.
B,Pipe relationship
The drain pipe and overflow pipe must be set up in close proximity to drain ditch or drain outlet, effortless to drain, and put in drain h2o valve on drain pipe before magnetic valve there should be service valve on drinking water pipe.
 If use plastic pipe (this sort of as PPR pipe or Ab muscles pipe), users should take into account pipe grow and contract issue between heat pump and water tank.
 Water provide valve and reduce-off valve possibly need insulation (in accordance to nearby temperature issue),stay away from frost crack.
C,H2o pipe program installation
Water pipe should be straight, and the set up must be realistic, decrease bend as minor as feasible. Reduce the drinking water pipe resistance.
There can’t be leaking at any place of pipe.
Following all equipments and pipes installation completed, customers should check water stress, and travel air out, drain filthy out, make certain h2o cycle system is  clean. Right after verify there is not any issue, then insulate all scorching h2o pipes.
D,Electricity offer wiring
 220V heat pump use solitary stage electrical power provide, 380V heat pump use three stage power supply, wire line is 3phase 4lines, A B C connects reside line, N connects null line, E connect earth. Be sure not to hook up N line to reside line of power source.
 1).When restoring, remember to switch power supply at “off” facet.
 2).Electrical power supply connecting procedure:make positive a equipment power offer is minimize off ahead of its installation is concluded. Install power supply switch at suited spot, Use rubber hole for wiring line in electric box.
Electricity offer need:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
 3).if power provide fluctuation is out of need, please don’t commence your warmth pump.

 

Emerson Copeland Compressor Air Cooled Scroll Water Chiller