Portable Air Cooled and Water Cooled Chiller

Portable Air Cooled and Water Cooled Chiller

one.Application of scroll business air cooling water chiller
This collection of chiller relevant scope contains: market, business office, professional constructing, manufacturing facility workshop, guesthouse, hospital and civil design facility. 

two.Eurostars CZPT Air CZPT Scroll Drinking water Chillers Features:
1) CZPT scroll compressor, tranquil and large efficiency. 
two) Higher efficiency warmth exchanger.
3) More stages adjustment precision enlargement valve.
4) Schneider /Fuji/EATON electrical components.
five) CZPT managing technique.
6) CZPT EE valve, exceptional effectiveness at different ambient temp.
seven) Effortless set up and Lcd procedure.

3.Air Cooled Scroll CZPT H2o Chiller CZPT Datas

Air Cooled Chiller Unit(commerical variety)
Model      ESSA- 05STN 10DTN 12DTN 20QTN 25QTN 20DTN 25DTN
Rated CZPT Potential KW 14 28 34.5 58.2 66 58 sixty seven
USRT 4. 8. nine.eight 16.six 18.eight sixteen.5 19.one
×1000 kcal/h twelve. 24.1 29.seven fifty.one 56.8 forty nine.9 57.six
Refrigerant R407C
Evaporator Tank Tube in Shell  Shell and Tube
Condenser Ripple Aluminum Fins around Cooper Pipe
                   
Model      ESSA- 25DTP 40QTN 50QTP 80DTP 100QTP 160QTP
Rated CZPT Capability KW sixty six 106 130 230 290 460
USRT 18.8 30.one 37. sixty five.4 82.five a hundred thirty.8
×1000 kcal/h 56.8 ninety one.2 111.eight 197.8 249.four 395.six
Refrigerant R410A R407C R410A
Evaporator Shell and Tube 
Condenser Ripple Aluminum Fins all around Cooper Pipe

four.Air Cooled Scroll H2o Chiller Principal Components Introduction
one)CZPT /CZPT Compressor :Large high quality Scroll CZPT.
2)Enthusiast: Well picked axial enthusiast motor blended with huge fan blade, which offer weighty air blow at lower rotate velocity, decreasing vibration and noise.
3)Enlargement Valve: SXIHU (WEST LAKE) DIS./CZPT /Emerson Enlargement valve, with a lot more exact control of refrigerant stream technique, which improve warmth pump working ability and performance below various ambient problems.
four)Higher Successful water facet warmth exchanger:
a) Tube in shell tank kind: Enhance style of both inner and outer screwed tube, it will help to enhance heating exchange performance, and provide better heating potential. The unique style of liquid refrigerant circulating tube on the base of condenser guarantees the warmth pump program run effortlessly in severe doing work situation.
b)Brazed-plate evaporator: created from stainless metal characteristics a manufacturer-new diagonal style to greater use heat exchanging surfaces.
c)Shell and tube dry type evaporator: with internal grooved cooper tubes optimizes the cooling and heating effectiveness.
Self-cleansing, large intensity, anti-shaking design and style and warmth insulation covering substance make sure shell and tube warmth exchanger unstained,reliable,quiet,extremely productive.
five)Air Aspect Warmth exchanger: Blue hydrophilic fin and copper tube heat exchanger.
six)AC contactor & Thermal relay: Higher good quality FUJ/Schneider /EATON or other brand name contactor and thermal relay can freely flip on/off far more moments.
seven)Xihu (West Lake) Dis.nized PCB Design and style: Military degree PCB components, smart managing program strengthened a dependable procedure of the warmth pump unit. Special colored wiring design and style on the PCB gives fantastic comfort in set up and more routine maintenance.
8)Noise Isolated Content: Employing higher good quality aerial sound isolated content, sounds and vibration is prevented perfectly(optional).

five. EUROSTARS CZPT Air Coooling Scroll Water Chiller Series

6.About US
We, EUROSTARS, which recognized in yr 2006, is a contemporary hello-tech company, specializing in Heating Ventilation Air Conditioning and CZPT CZPT analysis, improvement, creation, income and engineering solutions which be often listed here to give subsequent services:
1) Task system layout
two) CZPT assist
3) CZPT production
four) Supply
five) Installation
six) Take a look at and commissioning
seven) Mend and servicing
8) Following sale service, and many others

7.FAQ
Q: What type of CZPT support Eurostars can supply?
Before promoting
one. Set up clients file, and organize professional sale engineers to introduce firm items and services to customers in element.
2. If consumers are interested in our goods, we will send out skilled specialists to survey the installation surroundings.
3. Make the solution in accordance to diverse customers’ requirements.

In the course of promoting
one. CZPT installs and take a look at by qualification engineers.
two. Make certain all the merchandise we provided are certified and new. The functioning daily life of the main engine is 15-20 years.
3. Construct and set up the warmth pump according to national relevant insurance policies strictly, and make sure large good quality supply on time.
four. Examination and debug the equipments strictly to make sure the security and steadiness.
five. During the shipping, supply extensive and professional complex training on recommendations and servicing to consumers.

After offering
1. We assure to provide totally free consulting contact in 7×24 hours manner to solve the troubles discovered in apply.
2. CZPT guarantee is twelve~18 months from ex-factory date. In 18months,if any parts of your products destroyed since of quality, we offer new alternative for totally free.
three. Following the expiration of the high quality assurance, we will keep on to offer lifelong servicing services, with just charging some cost cost.

8.Client go to us

9.Air cooled drinking water chiller delivery or container loading

10. Set up instruction or set up photograph, undertaking photographs

A,Spot variety of set up Warmth pump
 1). Warmth pump need to be installed in a large room, and have great air stream condition.
 2). Air inlet and outlet have to be a clear highway, the length from barrier to inlet and outlet have to be longer than 2m.
 3). Established drain ditch or drain outlet, so that can drain drinking water easily.
 4). The installation base or bracket need to be firm, make certain heat pump function balancely.
 5). Make certain heat pump is vertical, cannot be slanted.
 6). Never put in heat pump at the area in exactly where there is lots of pollutional and corrosive gas or sand or fallen leaves.
 7). The installation place cannot be near inflammable, flammable thing or hearth.
 8). Set up:
—The set up foundation can be concrete construction, or metal bracket, and have to use anti-vibration rubber pad, And the surface should be smooth.
—The design of installation base can be according to warmth pump fat.
—The heat pump base ought to be fixed by bolt.
B,Pipe link
The drain pipe and overflow pipe must be set up near drain ditch or drain outlet, effortless to drain, and set up drain drinking water valve on drain pipe ahead of magnetic valve there need to be services valve on h2o pipe.
 If use plastic pipe (this kind of as PPR pipe or Ab muscles pipe), customers must contemplate pipe broaden and agreement dilemma amongst heat pump and h2o tank.
 Water source valve and reduce-off valve perhaps require insulation (according to neighborhood climate issue),steer clear of frost crack.
C,Water pipe technique set up
Water pipe must be straight, and the set up ought to be realistic, reduce bend as tiny as feasible. Lessen the drinking water pipe resistance.
There cannot be leaking at any location of pipe.
Soon after all equipments and pipes installation completed, end users must test water strain, and travel air out, drain dirty out, make confident drinking water cycle method is  clean. Right after validate there is not any problem, then insulate all hot h2o pipes.
D,Power offer wiring
 220V heat pump use solitary stage energy source, 380V heat pump use three phase energy provide, wire line is 3phase 4lines, A B C connects dwell line, N connects null line, E connect earth. Be sure not to link N line to stay line of energy provide.
 1).When fixing, you should turn power source at “off” side.
 2).Power supply connecting process:make certain a equipment power supply is minimize off just before its set up is completed. Put in power supply change at suitable location, Use rubber hole for wiring line in electrical box.
Electrical power provide demand:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
 3).if electricity offer fluctuation is out of desire, please never commence your heat pump.

 

Portable Air Cooled and Water Cooled Chiller