Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit

Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit

one. Eurostars air managing device and air handler attributes
one) AHU scenario is the high-energy aluminum alloy frame, with built-in insulation resources, no cold bridges.
2) The aluminum material surface area handled by anodizing appears good and corrosion-resistant. The panel is 25mm thick and of double skin framework.
   Both the internal and outer panel plates are produced of top quality Korean galvanized steel painted, lovely and fashionable layout
three) The sandwiched PU foam insulation content among the plates make certain the very best overall performance of insulation, intensity, rigidity, cleanliness and noise insulation for the AHU,
   and make sure no condensed drinking water on the surface
4) In the gap amongst the frame and the panel dampness-evidence content has been employed to seal up, keep away from air leakage and strength reduction
five) The foundation frame is sizzling-dip galvanized steel, Anti-corrosive

two.Eurostars Air handler,air managing device, ahu software
one) Heating
two) CZPT
three) Ventilating
4) Air-conditioning (CZPT)program
this sort of as searching mall, business middle ,Medical center and procedure area ,thoroughly clean area , dust-totally free plant

three.Air handler specialized information, Assembly drawing diagram and photograph

Ceiling Ducted Air Handling Device(Return Air Issue-four Rows)
Product Air Flow   Total
Pressure
Power Enter Return Air
CZPT Capacity Heating Ability H2o Flow  Water Resistance Drinking water inlet/outlet pipe Diameter
*1000CMH Pa kW kW L/min kPa DN
EST2CD4 2 250 .25 twelve.seven seventeen.6 36 eight.8 twenty five
EST2.5CD4 two.five 250 .32 15.5 21.6 forty four.4 12.seven 25
EST3CD4 three 300 .55 eighteen.7 26.1 fifty three.4 19.6 32
EST4CD4 4 three hundred .75 26 36.2 seventy four.4 21.six 32
EST5CD4 5 350 one.one 32.three 44.eight ninety two.four 17.6 forty
EST6CD4 6 350 1.5 37.three 52.one 106.eight 20.six forty
EST7CD4 7 350 one.five forty three.9 sixty one.3 126 28.4 fifty
EST8CD4 8 350 two.two 50.6 70.5 a hundred forty five.2 29.four 50
EST10CD4 ten 350 two.two sixty.4 eighty four 172.eight 21.6 50
EST12CD4 twelve 350 3 73 a hundred and one.seven 209.4 22.five 50
Ceiling Ducted Air Handling Device(Return Air Situation-6 Rows)
Model Air Flow   Total
Force
Power Input Return Air
CZPT Ability Heating Potential Water Movement  Water Resistance Water inlet/outlet pipe Diameter
*1000CMH Pa kW kW L/min kPa DN
EST2CD6 two 250 .twenty five sixteen.9 21.eight forty eight 10.eight twenty five
EST2.5CD6 2.five 250 .32 twenty.seven 26.7 58.8 sixteen.7 twenty five
EST3CD6 three three hundred .fifty five 24.three 31.five sixty nine.six 18.6 32
EST4CD6 four 300 .seventy five 31.six 40.nine ninety.six 20.six 40
EST5CD6 5 350 one.1 39.3 fifty.seven 112.two 30.4 forty
EST6CD6 6 350 one.5 45.6 fifty nine.one one hundred thirty.8 seventeen.6 fifty
EST7CD6 7 350 one.5 54 sixty nine.nine 154.eight 21.6 50
EST8CD6 8 350 2.two 62.8 81.three 180 22.5 50
EST10CD6 10 350 two.two seventy eight.7 one zero one.eight 225.six thirty.4 fifty
EST12CD6 12 350 three 94.four 122.1 270.6 33.3 65
Notice:
  1. Return air: CZPT: Air in 27ºC DB, 19.5ºC WB,Chilled h2o in/out:7ºC /12ºC
  two. Return air: Heaing: Air in 15ºC DB,Sizzling water in: 60ºC.

four. Eurostars air managing unit , air handler selection or sequence
-Ceiling ducted(jet movement) air dealing with device
-Vertical floor (free blow)standing air managing device
-Horizontal ground standing air managing unit
-Modular Modulus Air Managing Unit-multi-operate air managing unit

5. Factors-air managing unit or air handler
Casing Panel and Insulation
• Double skin building is provided by sandwich kind panels comprising interior and outer painted steel skins and polyurethane foam with least 48kg/m3 density,
   delivering a good thermal and acoustical functionality
• The gasket liner between the panels and frame makes certain the air leakage rate to comply with GB/T 14294 cleanse air conditioning requirement
• The manufacturing facility painted steel sheet coated with 6 insulation coatings, complies to 500h salt spray tests, demonstrating an exceptional corrosion security overall performance

Body
•Penta-publish extra weighty gauge aluminum profiles and strong fiber-strengthened PE corner relationship forming the structural  frame
• outstanding mechanical power and rigidity to the device frame and to avert any buckling or deformation
• Thermal bridge totally free style, the profiles crammed with polyurethane foam for insulation
• Anodizing floor treatment method for profiles, corrosion-resistant
• CZPT steel frame offered

Sizzling-Dip Galvanized Foundation channel
Provide Rigid Foundation Channel shield device and save installation expense

CZPT Manufacturer Blower and Motor
•CZPT conserving Admirer with lower pace and lower noise
•Type: Immediate driven / Belt driven
            CZPT curve and backward curve
            Centrifugal enthusiast and EC plug fan
•Brand: Nicotra, Kruger, Deton, Yilida available
•Low sounds lengthy life Motor
•Brand: Siemens, ABB and Teco available

Vibration Eliminator
• To lessen the transmission of vibration and sounds, admirer and motor are set up on an impartial total foundation frame
• The full foundation body is isolated by deflection sort spring isolators
• This special composition not only decrease the vibration and noise, but also safeguard fan and motor for the duration of transportation

Higher Effectiveness CZPT and Heating Coil
• All coils calculation and assortment is done by assortment software to match the needed circumstances
• Large coil face region guarantees optimum warmth transfer fee
• All coils examined at 30bar stress underwater 24 hrs
• Various corrosion resistance coils for choice:
-Cooper tube with cooper fins coil
 -Epoxy coated fins coil
 -CZPTtrophoresis fins coil
-Heresite coated coil

Substantial Effectiveness CZPT
Air filter contain main air filter, medium efficiency air filter, higher impact and sub-high effectiveness particulate air filter.
a) Major filter have board variety and pocket kind, board sort air filter use fiber components, pocket variety primary air filter use Non-woven or specific chemical fiber,
     have the gain of washable, reduced resistance, stable performance and so forth, filter grade G1~G4.
b) Medium performance air filter have board sort and pocket variety, use ultra-thin chemical fiber or fiber glass, have the advantage of prolonged services-lifestyle, steady functionality,
    filter quality F5~F9
c) Large effectiveness and Sub-large effectiveness particulate air filter use ultra-thin chemical fiber or fiber glass, have dense folded sort and pocket kind for decide on,
    filter grade can reach up to H13.

CZPT Metal Drain Pan
• Slop sort design and style, no drain h2o carryover and keep the pan dry
• Stay away from the micro-organisms growth inside the drain pan
    Antimicrobial Drain Pan is supplied as choice
• SteriTouch technology Drip Pan Coating
• Antimicrobial floor
• Very good exterior sturdiness and corrosion resistance
• Exceptional adhesion
• Non-harmful, comply with BS476 part seven

Air damper
•Variable discharge air quantity
•Discharge damper with axial fan, unbiased manage
•High performance
•Manual damper offered

Humidifier optional
The humidifier usually be utilized have: electrode humidifier, dry steam humidifier, higher strain spray humidifier and soaked movie humidifier and many others
a)CZPTtrode humidifier
Isothermality humidification type, use AC electricity can immediate heating drinking water supply to create thoroughly clean vapour and blend vapour with the air, include-soaked into the air. the advantage is humidifying rapidly, humidifying volume can adjustable, humidifying vapour is clear, no incrustation scale,no dust, sterile and odourless, handy to servicing.

b) Dry vapour humidifier
Isothermality humidification type, higher humidification efficiency, corrosion resistance, in location have vapour supply,dry vapour humidification will have a increased humidification manage precision

c) Substantial force spray humidifier
Isenthalpic humidification procedure,use stainless drinking water distributor and sprayer,higher stress spray,substantial strength efficiency,secure and reliable.high strain spray humidifier humidification effectiveness forty%~fifty%.

d) Moist film humidifier
Moist film humidifier have advantage of large saturation effectiveness,help save water,preserve power etc

PTC CZPTtric Heating optonal
•Constant temperature heating
•Virtually limitless existence
•Low electric power consumption and extremely reduced in price
•No electrical sounds
•The greater the temperature, the a lot more electric power productive
•Avoid burning when in speak to with flamable supplies

Warmth Wheel Heat Exchanger(optional)
• Hugely productive power-saving rotary warmth exchanger
• CZPT restoration costs between 70-ninety%
• Summer time application is dehumidification of warm and humid offer air to lessen the vitality consumption of the down stream cooling equipment. 
• Winter season operation recovers moisture from the exhaust air to lessen the humidification load.

CZPTtrostatic Precipitator(optional)
• Adsorb and eliminate particles significantly less than .01 micron in the air
• Enhance indoor air quality 
• ESP applies power only to the particulate subject getting collected and as a result is really effective in its intake of energy

CZPTtrical control cabinet(optioanl)
•According to the requirements and capabilities of the unit to design the handle console or cabinet
•Auto manage each and every section of the unit to make sure the temperature, humidity and cleaness 
•High good quality and intercontinental brand electrical components
•DDC and PLC accessible

six.Why pick us?
EUROSTARS Advantages: 
one) The Proof of CZPT: Now we have customers in different countries and places, such as Mexico, Australia, New Zealand, Singapore, Argentina, Middle- CZPT, Africa…
two) The Guarantee of CZPT: Reasonable design, Professional technicians, Stable production workers, Full-scale
 CZPTs, Strict QA & QC system…
3) Custom-made Design: We supply our design drawing according to customer practical situation
4) CZPT Support: 
 Walk in cold room: we supply our diagrammatic drawing, feel easier for installation.
 Cold storage warehouse: We have professional engineers who can go aboard to supply technology support and direction, until  turn key for our customers. 
5)CZPT CZPT Operation: We have concentrated on international trade of cold storage room line for many years, accumulated various experience from different customers of different countries. So we can update our operation in time according to our customers and new rules. It is helpful to clear custom and save cost and time for our customers.

seven.FAQ
one:Are you a manufacturing facility?
— Sure, we are a professional producer for much more than 13 years

2:How do you verify the merchandise?
— We examine all the resources when they get there, and have spot inspection throughout creation method. All items will be tested and double inspected before shipping and delivery, supplying 100% assure for clients.

three:How to select the suitable designs?
—The parameters over is just for your reference. We need you to provide us the air stream, ESP or TSP, cooling capacity, heating ability or application for our crew to design and style the appropriate device for you.

4:How and when can I get the quotation?
— Ship us the inquiry or go away us information. We will get back to you within one hour for the duration of the functioning time. All messages will be replied whenever they will come.

five:What is your payment terms?
— Generally we accept T/T or LC. 30% deposit. Other payment phrases can be discussed when orders verified.

6:Exactly where is your manufacturing unit Situated? How can I visit there?
— We situated in HangZhou, ZheJiang CZPT, which is in close proximity to HangZhou CZPT Airport. We can pick you up from the airport . You are warmly welcome to pay a visit to us

7:Do you give OEM provider?
— Yes! We give OEM and ODM support.

eight:What is actually the direct time for your merchandise?
— Normally 25~30 workdays. For urgent orders, we can make special arrangement to fulfill your request. 

eight.Consumer go to us

9.Air handling device,air handler shipping or container loading

ten.Installation instruction or installation photo, undertaking photographs
—1. Throughout set up, enough area ought to be reserved all around the device, specifically apart the obtain door and drinking water pipe, for the mend device passing. 
—two. The unit should be mounted on flat foundation (concrete or welded C-channel).  Drainages are offered all around the base.
—3. Ground drain must be established in the device space for the discharge of condensing water and washing water.
—4.Pay out attention to condensing drinking water discharging to make sure the condensing drinking water discharge smoothly.
—5. The unit need to be put in on a horizontal platform or hanger.  Soon after the unit is installed, link the types of pipes and ducts:
A. The chilled h2o pipe link with cooling coil
B. The condensing drinking water drain pipe connection
C. Humidifier pipes link
D. The connection for the new/return air inlet with its air ducts
E. The wiring relationship for the management box.
When connecting the air duct, one hundred-150mm flexible connection (airtight canvas or synthetic leather-based cloth) need to be established among flange and air inlet/outlet, to steer clear of the air leakage triggered by the device vibration.

The manage box usually is put in on the device cupboard or in the device place. Make sure you make the wiring in accordance to the relevant electrical regulation by your nation.

—6.Following all drinking water pipe, wirings and air duct are accurately connected, the air dealing with unit can be started.
[ !]The 1st time starting need to be instructed by an seasoned man or woman at site, non-skilled individual are unable to function the gear without permit.  The defect triggered by misuse shall not be our obligation
[ !] Ahead of initial time beginning, remember to take away the short-term repairing plate from the supporter and motor
[ !] The power and voltage supply need to be appropriate with the unit.  Right after connecting the electricity to the motor, start off motor very first, then verify the working path of the admirer. If it is operating in reverse path, make sure you end and alter the section sequence, then connect the energy to motor ultimately. If there is defense unit on the offer fan motor, the motor raring must be related to ground.  The motor in this unit use “lowered voltage starting up”.
—7. Adjustment of the driving belt
—8. Ahead of transferring the unit, please fasten the damping gadget.  Placing down need to be little by little to make positive that the damping unit is forced evenly to safeguard the damping gadget.  The relationship among damping system and the device should not be by welding

 

Dx Water Fan Coil Inveter Modular Ahu Air Handler Air Handling Unit