1.65m3 Min 7bar Oil Injected Rotary Screw Air Compressor

1.65m3 Min 7bar Oil Injected Rotary Screw Air Compressor

 

                        Technical Information of Direct CZPT CZPTtric Motor CZPT Air CZPTs                    

Model Doing work Pressure Capacity Motor Electrical power CZPTn Approach CZPT Technique Dimension(mm) Net Bodyweight Air Outlet Pipe Diameter
Psi bar Cfm m3/min kw/hp L W H KGS
SGD08 102 seven 42.four 1.two seven.five/10 Direct CZPT Air CZPT
/
H2o CZPT
900 670 850 two hundred one/2”
116 8 38.8 1.1
one hundred forty five ten 33.five .ninety five
174 twelve 28.three .eight
SGD11 102 7 fifty eight.three 1.sixty five eleven/fifteen 1080 750 1571 280 3/4”
116 8 53. one.5
a hundred forty five ten forty five.9 one.3
174 twelve 38.8 one.one
SGD15 102 seven 88.three two.5 15/twenty 1080 750 1571 300 3/4”
116 eight eighty one.2 two.three
a hundred forty five ten seventy four.two 2.1
174 twelve 67.one 1.9
SGD18 102 seven 113. 3.two 18.five/twenty five 1380 850 1185 430 1”
116 8 one zero five.9 3.
145 10 ninety five.three two.7
174 12 eighty four.7 two.4
SGD22 100 seven 134.2 three.eight 22/thirty 1380 850 1185 450 1”
116 8 127.1 3.six
a hundred forty five 10 113. 3.two
174 twelve ninety five.three two.7
SGD30 102 seven 187.1 5.three thirty/40 1380 850 1185 five hundred 1”
116 8 176.6 5.
145 ten 158.9 four.five
174 12 141.two 4.
SGD37 102 7 240.1 6.8 37/50 1500 one thousand 1345 650 eleven/2″
116 8 218.9 six.two
145 10 197.seven 5.six
174 12 176.six five.
SGD45 102 seven 261.3 seven.4 forty five/60 1500 one thousand 1345 680 11/2″
116 eight 247.two 7.
a hundred forty five ten 218.nine 6.2
174 twelve 197.7 5.6
SGD55 102 7 353.one ten. fifty five/seventy five 1800 1250 1670 1150 two”
116 8 339. 9.6
145 ten 300.1 eight.5
174 12 268.four seven.six
SGD75 102 seven 473.2 thirteen.four 75/100 1800 1250 1670 1200 two”
116 eight 444.9 12.6
a hundred forty five 10 395.5 11.2
174 12 353.1 ten.
SGD90 102 seven 572. sixteen.2 ninety/one hundred twenty 1800 1250 1670 1350 2″
116 8 529.7 fifteen.
one hundred forty five 10 487.three 13.8
174 12 434.3 12.3
SGD110 102 7 741.five 21. 110/one hundred fifty 2300 1470 1840 1800 2 1/2”
116 eight 699.1 19.eight
one hundred forty five ten 614.four seventeen.4
174 twelve 522.6 14.8
SGD132 102 7 865.1 24.five 132/175 2300 1470 1840 1850 2 one/2”
116 8 819.2 23.two
145 10 723.9 twenty.5
174 12 614.4 17.4
SGD160 102 7 1013.4 28.seven a hundred and sixty/two hundred 2300 1470 1840 2000 two 1/2”
116 eight 974.6 27.6
one hundred forty five ten 868.6 24.6
174 twelve 759.two 21.5
SGD185 102 7 1129.9 32. 185/250 3150 1980 2152 3500 DN85
116 eight 1073.4 thirty.4
145 ten 967.5 27.4
174 12 875.seven 24.8
SGD220 102 seven 1271.2 36. 220/300 3150 1980 2152 3800 DN85
116 8 1211.one 34.3
a hundred forty five ten 1066.4 thirty.two
174 12 978.1 27.7
SGD250 102 seven 1483. forty two. 250/350 3150 1980 2152 4000 DN85
116 8 1430.1 forty.5
a hundred forty five ten 1348.8 38.two
174 twelve 1218.2 34.five
SGD315 102 7 1800.eight 51. 315/430 4000 1980 2152 6000 DN110
116 8 1772.6 50.2
a hundred forty five ten 1571.three 44.five
174 twelve 1412.four 40.
SGD355 102 seven 2259.8 sixty four. 355/480 4000 1980 2152 6500 DN110
116 eight 2153.nine 61.
145 10 1995. 56.5
174 12 1730.two 49.
CZPTting Mode: Y-△
Motor CZPT CourseIP23/IP54/IP55 or as for every your required
Voltage: 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests.


Q1: What is the rotor speed for the air finish?
A1: 2980rmp.

Q2: What’s your lead time?
A2: usually, 5-7 days. (OEM orders: 15days)

Q3: Can you offer water cooled CZPT?
A3: Yes, we can (typically, air cooled kind).

This autumn: What’s the payment term?
A4: T/T, L/C, CZPT CZPT, etc. Also we could accept USD, RMB, and other currency.

Q5: Do you accept CZPT voltage?
A5: Yes. 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests.

Q6: What is your warranty for CZPT?
A6: One year for the complete CZPT(not which includes the use spare components) and technical supports can be offered according to your demands.

Q7: Can you settle for OEM orders?
A7: Sure, OEM orders are warmly welcome.

Q8: How about your customer service and after-sales service?
A8: 24hrs on-line support, 48hrs problem solved promise.

Q9: Do you have spare parts in stock?
A9: Yes, we do.

Q10: What kind of initial lubrication oil you used in CZPT?
A10: TOTAL 46# mineral oil.

1.65m3 Min 7bar Oil Injected Rotary Screw Air Compressor