Air-Cooled Refrigeration Condenser Dual Flow Unit Cooler Air-Cooled Condensing Unit

Air-Cooled Refrigeration Condenser Dual Flow Unit Cooler Air-Cooled Condensing Unit

Air-cooled CZPT Condenser Dual Flow Device Cooler Air-cooled Condensing Device

CZPT units

Condensing device is the most important portion of complete chilly room system. It has the function of a heat exchanger to cool down and condense the incoming refrigerant vapor into liquid and a enthusiast for blowing exterior air through the warmth exchanger area to great the refrigerant inside of.  

 

How to decide on condensing device?

Condensing device:

In accordance to the real circumstance to select the most price-effective answer for consumer:
 

 

 

Device cooler:

DL,DD,DJ,DCJ model:unilateral out of the wind,SDL,SDD product :bilateral out of the wind

 

 

Panels Packing

PU panel have reduced thermal conductivity, , very good stability,  light potential, substantial strength, heat insulation, sound insulation, chilly, corrosion, non-absorbent ect:

 

Density:38~42kgs/m³

 

     Our PU panel density 38~42kg/m3 is  existed.This suggest that the enhance in density in excess of the limit or reduction of it  under this sum lesda to improved heat transfer coefficient,or basically more strength will be squandered.In this regard,maitaining the sought after density according to the above subjects is the most important and great quality element.

How to shield the goods for the duration of transport approach?

Our modular cold place series is an integrated family members of sandwich panels designed forquick cold place assembly. The panel configuration has been decreased to a minimum, so the total result

is to offer the consumers maximum design choices for chilly rooms with a minimum volume of panels essential on the internet site. All merchandise from the modular assortment can be simply assembled

with out the need for unique resources. When the cargo prepared, we will pre-set up the cold room for

you to make sure every single component is ok. 
When you get the cargo, you can not use the fork checklist, since it will be destroyed

FAQ 

Q1,What information should I let you know if I want to get a quotation?

one.What’s the products do you want to store in this cold room?

2.Will this cold room be installed inside building or put outside?

3.Could you provide the detailed inside dimension of this cold room?(m)

four.What’s the thickness of cold room panel?(Including the wall panel, floor and roof panel)(mm)

5.Which kind of door do you prefer,Sliding type or hing type? 

Q2. Can your manufacturing facility take CZPT ? 

We can do CZPT dimension according to customers’requirements. We have access to all the leading Cold Room refrigerators brands and can offer independent advice, and recommend right equipment to meet your business requirements.

Q3. How lengthy supply time ? 

one. 220V-380V, 50Hz electrical power need 15-twenty five days

two. If you voltage special in China, we need costomized refrigeration gear, need 45 days.

Air-Cooled Refrigeration Condenser Dual Flow Unit Cooler Air-Cooled Condensing Unit