Terek Double Acting Pneumatic Gas Booster Pump System for Accumulator Refilling

Terek Double Acting Pneumatic Gas Booster Pump System for Accumulator Refilling


Solution Description

The CZPT gas booster products Utilizes pure compressed air as the driving energy resource, and Utilizes fuel booster pump as the stress source, nitrogen, oxygen, helium,N2O,Argon, CO2 and other gases as the pressurized medium. The output stress is proportional to the driving gasoline pressure. By altering the stress of the driving gasoline source, the corresponding force of the pressurized fuel can be attained.

When the pressure of the driving gas resource is balanced with that of the pressurized fuel, the pneumatic booster pump will be routinely stops and the output gas pressure is stabilized at the preset strain. For that reason, it has the attributes of explosion-proof, power preserving, environmental protection, adjustable output force, tiny quantity, light weight, basic operation, trustworthy performance and wide software variety.

To function this system, The travel gas from the CZPT is necessary to commence the CZPT booster pump. The strain of the generate gas can be adjusted by valves and force gauges, and the output fuel pressure can be altered

The expected doing work strain can be achieved by adjusting the strain of the drive inlet.. When the driving air strain and the output force are harmony, the pump stops filling force and the output pressure remains at the preset benefit.

Product parameters

Type Stress ratio Min gasoline inlet stress PA Max gasoline inlet pressure PA Max permitted outlet stress PB Formulation to estimate fuel outlet strain PB Max circulation LN/min
 (PL=6bar)
bar psi bar psi bar psi
GU-GTC10 10:1 five 72.5 eighty 1160 80 1160 10PL+PA 372(PA=20bar)
GU-GTC25 25:1 10 145 two hundred 2900 two hundred 2900 25PL+PA 154(PA=20bar)
GU-GTC40 forty:1 15 217.five 320 4640 320 4640 40PL+PA 92(PA=20bar)
GU-GTC60 sixty:1 25 362.five 480 6960 480 6960 60PL+PA a hundred and fifteen(PA=40bar)
GU-GTC100 100:one 35 507.5 800 11600 800 11600 100PL+PA 74(PA=40bar

 Refer to model technological parameters.

Solution title CZPT fuel booster pump force management bench
Product GU-GTC-40
Force ratio forty:one
Medium Nitrogen or Oxygen ,Helium ,Argon.Co2 ,N2O. and so on
Greatest outlet strain 320bar  (32MPA)
Maximum outlet movement 92 L/min (Inlet gas strain 20bar)
Optimum outlet stream 184 L/min (Inlet gasoline stress 40bar)
Min gasoline inlet force 15 bar
Max gas inlet stress 320 bar
Electrical power resource CZPT gasoline booster pump
Handle device Higher stress needle valve
Pressure management accuracy less than 1%F.S
Pressure measurement precision .4 pressure gauge
Valves and piping Large force needle valve and stainless metal piping
Relationship size(inch)   Gasoline inlet NPT1/4  Female thread
Link size(inch)   Gas Outlet NPT1/4  Feminine thread 
CZPT Bodyweight 45KG
Export CZPT wood case Excess weight 55KG
CZPT Dimension 600*450*570  mm
Packing measurement: 660*520*570  mm
Creation time ten-12days
Supply location The goods can be sent by air specific to your selected tackle
Air categorical Delivery time 4-5days

 

Technique configuration:

CZPT gasoline booster pump makes use of compressed air to travel big region finish piston to modest area conclude to get substantial pressure gas output.. Can be used for compressed air and other fuel, the output pressure can be adjusted by inlet valve,  The output can guarantee gas is not contaminated. CZPT stress sustaining. CZPTn by gas, No spark or Flame and No generating heat, Can use it in unsafe areas.

GU-GTC  series fuel booster device handle cupboard mostly includes one established of GTC series air-driven fuel booster pump, pressure gauges, air filter, gas inlet filter, control valves, air regulating valve, pipelines, cupboard, and force release valve etc.

In purchase to make sure the prolonged-time period use and secure operating efficiency of the products, we offer a established of sealing components, fix package, sealing tape, and so forth .

Thorough Pictures

Merchandise positive aspects

 1.Specially appropriate to the higher force assessments and ultra-large strain assessments in the field or in the workshop

2. The pump will stop operating routinely when the output stress reaches the preset worth,

3. Sustain long functioning several hours with no vitality expenditure

4.No dissipated heat during the stress keeping stage

5.No threat for explosion and spark in oil and fuel area

six. The pump will commence routinely when the outlet stress drops marginally or the air drive stress increases.

seven. The operating force can be adjusted by adjusting the stress of the pushed air.

Software Fields

1.Stress examination with gas

two.Fuel transfer and filling(Argon/Helium/Hydrogen/Oxygen/Nitrogen/CO2/NO2/CH4/LNG/LPG/CNG/FM200 and so on.)

3.Charging of gas cylinder and accumulator with nitrogen

four.CZPT for isolating fuel programs

five. Higher force gasoline injection program for a variety of industries

6.Transfer of oxygen cylinders

7.Charging of respiratory air bottles

eight.Leak test

9.Hydrostatic Tests for valves, tanks, stress vessels, stress switches, hoses, pipes and tubing, force gauges, cylinders, transducers, effectively casings, gasoline bottles and air craft factors

CZPT & CZPT

Firm Data

ZheJiang CZPT CZPT & CZPT Co.,LTD was set up in 2000.

CZPT Business concentrate on provide various varieties of pneumatic and hydraulic booster pumps, Basic safety valve examination bench, booster techniques and stress answers to the consumers all over the world ,

With more than eighteen a long time ordeals in fluid force trade and managing discipline.Good high quality items and perfect soon after-sale support have received us a good reputation and a whole lot of consumers equally at residence and abroad.

FAQ

 1.Q : Are you maker ?

A: Of course, We are the producer with constant and enhanced R&D. Creation, CZPT Verify and support offer.

two.Q : Can I get your price listing ?

A: Of course, Sure. In buy to send out you our offered offered price tag. Please choose the merchandise and let us know the solution design and need in detail.

3.Q : Do you have stock for all items?

A:In general, we have some inventory, while if you require a bulk purchase, we nonetheless require time to produce it. Of training course, we will notify all details you prior to your payment.

4.Q : What is payment conditions ?

A: Sample buy : one hundred% full payment just before start off to generation

Large buy : thirty% deposit first, 70% pay after see the BL duplicate

5.Q: Can give cost-free sample ?

A : Free of charge : if tiny spare parts and the price not as well a lot is ok

Not Totally free : the expense pricey and all the device can not be free

6.Q : How prolonged can be completed the merchandise ?

Supply date:  ten-15  functioning times right after deposit paid

Two many years warranty, when the items get to to vacation spot.

 

Terek Double Acting Pneumatic Gas Booster Pump System for Accumulator Refilling