Terek Double Action Air Driven Gas Transfer Pump Stand for CO2 N2 Argon Gas Refilling

Terek Double Action Air Driven Gas Transfer Pump Stand for CO2  N2  Argon Gas Refilling


Item Description

The CZPT gas booster products Makes use of pure compressed air as the driving energy resource, and Employs fuel booster pump as the force resource, nitrogen, oxygen, helium,N2O,Argon, CO2 and other gases as the pressurized medium. The output pressure is proportional to the driving gas strain. By adjusting the force of the driving gas supply, the corresponding pressure of the pressurized fuel can be acquired.

When the strain of the driving gas resource is balanced with that of the pressurized gas, the pneumatic booster pump will be routinely stops and the output fuel force is stabilized at the preset stress. As a result, it has the characteristics of explosion-proof, power conserving, environmental security, adjustable output stress, small volume, gentle fat, basic procedure, reputable efficiency and extensive software variety.

To run this technique, The push gasoline from the CZPT is essential to start the CZPT booster pump. The strain of the drive fuel can be adjusted by valves and stress gauges, and the output gasoline pressure can be modified

The predicted working force can be accomplished by altering the strain of the push inlet.. When the driving air stress and the output stress are equilibrium, the pump stops filling stress and the output force remains at the preset benefit.

Item parameters

Variety Stress ratio Min gas inlet force PA Max gas inlet pressure PA Max permitted outlet pressure PB Formula to determine gasoline outlet force PB Max circulation LN/min
 (PL=6bar)
bar psi bar psi bar psi
GU-GTC10 ten:1 5 seventy two.5 eighty 1160 80 1160 10PL+PA 372(PA=20bar)
GU-GTC25 twenty five:one ten one hundred forty five two hundred 2900 two hundred 2900 25PL+PA 154(PA=20bar)
GU-GTC40 forty:1 fifteen 217.5 320 4640 320 4640 40PL+PA 92(PA=20bar)
GU-GTC60 60:one 25 362.five 480 6960 480 6960 60PL+PA one hundred fifteen(PA=40bar)
GU-GTC100 a hundred:one 35 507.5 800 11600 800 11600 100PL+PA 74(PA=40bar

 Refer to design complex parameters.

Merchandise identify CZPT gas booster pump pressure control bench
Model GU-GTC-forty
Stress ratio forty:1
Medium Nitrogen or Oxygen ,Helium ,Argon.Co2 ,N2O. and so on
Greatest outlet strain 320bar  (32MPA)
Greatest outlet circulation ninety two L/min (Inlet fuel stress 20bar)
Greatest outlet movement 184 L/min (Inlet gas stress 40bar)
Min fuel inlet force 15 bar
Max gas inlet strain 320 bar
Electrical power source CZPT gas booster pump
Management device Substantial strain needle valve
Strain handle precision significantly less than one%F.S
Stress measurement accuracy .four stress gauge
Valves and piping Large stress needle valve and stainless metal piping
Connection dimension(inch)   Gasoline inlet NPT1/4  Female thread
Relationship dimension(inch)   Fuel Outlet NPT1/4  Feminine thread 
CZPT Fat 45KG
Export CZPT picket case Excess weight 55KG
CZPT Dimension 600*450*570  mm
Packing measurement: 660*520*570  mm
Creation time 10-12days
Supply place The items can be shipped by air categorical to your designated deal with
Air express Delivery time 4-5days

 

Technique configuration:

CZPT fuel booster pump utilizes compressed air to drive large region end piston to little spot conclude to get high strain fuel output.. Can be used for compressed air and other fuel, the output force can be modified by inlet valve,  The output can ensure fuel is not contaminated. CZPT strain preserving. CZPTn by fuel, No spark or Flame and No producing heat, Can use it in unsafe areas.

GU-GTC  series gas booster unit control cabinet mostly consists of 1 established of GTC sequence air-pushed fuel booster pump, stress gauges, air filter, fuel inlet filter, control valves, air regulating valve, pipelines, cupboard, and force launch valve etc.

In purchase to make sure the long-expression use and steady functioning efficiency of the tools, we supply a set of sealing components, fix package, sealing tape, and many others .

Comprehensive Pictures

Merchandise advantages

 1.Specially suitable to the large stress tests and extremely-higher strain checks in the field or in the workshop

2. The pump will cease doing work routinely when the output force reaches the preset value,

three. Preserve prolonged functioning several hours with no power expenditure

4.No dissipated heat throughout the pressure holding period

5.No threat for explosion and spark in oil and fuel discipline

6. The pump will start off automatically when the outlet stress drops marginally or the air drive strain boosts.

7. The working force can be modified by altering the force of the driven air.

Software Fields

1.Force take a look at with gas

two.Gasoline transfer and filling(Argon/Helium/Hydrogen/Oxygen/Nitrogen/CO2/NO2/CH4/LNG/LPG/CNG/FM200 etc.)

3.Charging of gasoline cylinder and accumulator with nitrogen

four.CZPT for isolating fuel techniques

5. Large strain gasoline injection system for various industries

6.Transfer of oxygen cylinders

seven.Charging of breathing air bottles

eight.Leak check

9.Hydrostatic Tests for valves, tanks, stress vessels, strain switches, hoses, pipes and tubing, stress gauges, cylinders, transducers, properly casings, gasoline bottles and air craft factors

CZPT & CZPT

Company Data

ZheJiang CZPT CZPT & CZPT Co.,LTD was established in 2000.

CZPT Organization target on provide numerous sorts of pneumatic and hydraulic booster pumps, Protection valve check bench, booster systems and force options to the consumers all over the planet ,

With far more than eighteen many years activities in fluid pressure trade and controlling subject.Great quality items and perfect following-sale support have received us a good reputation and a whole lot of customers the two at house and overseas.

FAQ

 1.Q : Are you maker ?

A: Of course, We are the manufacturer with constant and improved R&D. Production, CZPT Examine and services offer.

2.Q : Can I get your price tag record ?

A: Indeed, Positive. In order to send you our accessible provided price. You should decide on the goods and enable us know the product model and need in element.

three.Q : Do you have stock for all things?

A:In general, we have some stock, even though if you need to have a bulk order, we still want time to create it. Of training course, we will tell all details you just before your payment.

4.Q : What is payment phrases ?

A: Sample get : one hundred% complete payment just before commence to manufacturing

Big get : thirty% deposit initial, 70% pay following see the BL duplicate

5.Q: Can give totally free sample ?

A : Free : if small spare elements and the cost not way too considerably is ok

Not Free : the expense pricey and all the device can not be free of charge

six.Q : How long can be finished the goods ?

Shipping and delivery day:  ten-15  working days right after deposit paid out

Two many years warranty, when the merchandise attain to spot.

 

Terek Double Action Air Driven Gas Transfer Pump Stand for CO2  N2  Argon Gas Refilling