CZPT Air CZPT Tiny CZPTtric Air CZPT 4kw-37kw with Greatest Cost
Functions Of Sevro CZPT CZPT Air CZPT
one. Small, fast action swift response, huge overload ability, extensive velocity variety
2. The reduced-pace torque, lower volatility, secure operation
3. Low noise, large performance
4.The rear end of the encoder suggestions (optional) constitute a DC servo etc.
five. swing variety, frequency adjustable
six. The angle of Induction motor is three.6°1.eight, the servo motor is hugely Manage precision, the angle is .036°, To attain a shut-loop control of placement, velocity and torque To overcome the dilemma of out of stage of Induction motor.
seven. different functionality:
The induction motor is Open-loop control, the highly CZPTt Frequency or overload, it straightforward to Misplaced step or Stall, when cease, the large velocity will be Overshoot phenomenon. Consequently, in order to guarantee its handle precision, Should manage the acceleration and deceleration dilemma.
The servo motor is Closed-loop control, The driver sampling directly to opinions sign of Motor encoder, Inside structure Place loop and Speed loop, It does not look Missing step or Overshoot, There is more reliable manage performance
eight. The pace in response is diverse
It want two hundred to four hundred ms of Induction motor to speed up from standstill to working speed. But for servo motor, it only will take several ms to accelerate pace to 3000 rpm , It can be employed to handle programs that call for rapidly start-cease.
nine. comfort: heat and sound drastically lowered.
Simple position that is: The induction motor, it will working for a although simply because of its possess inertia following lower the electrical power. But servo motors are end swiftly, start off rapidly, quickly response
TCEHNICAL Requirements OF THE Direct Pushed SCREW AIR CZPT | |||||||||||
Model | AHD-30A | AHD-50A | AHD-75A | AHD-100A | AHD-120A/W | AHD-150A/W | AHD-175A/W | AHD-220A/W | AHD-250A/W | AHD-300A/W | AHD-350A/W |
Free of charge air supply /Discharge stress (m3/min /Mpa) | three.8/.7 3.6/.eight three.2/1. two.8/1.two |
6.8/.7 6.two/.8 five.six/one. 4.nine/one.two |
ten./.7 nine.one/.eight 8.five/one. 7.6/one.two |
thirteen.five/.7 12.six/.8 eleven.2/1. ten./1.2 |
16.1/.seven 15./.8 thirteen.eight/1. twelve.three/one.2 |
21./.seven 19.8/.8 seventeen./one. fifteen.three/one.2 |
25.two/.seven 24./.eight 21./one. eighteen.3/one.two |
28.7/.7 27.6/.8 24.six/one. 21.5/one.2 |
32./.7 thirty.five/.eight 27.five/1. 24.eight/one.2 |
36.seven/.7 34.five/.eight 30.2/1. 27.8/1.2 |
42./.seven 40.five/.8 38.1/1. 34.6/one.2 |
No.of compression phase | solitary stage | ||||||||||
Ambient temperature | ‘-five–+45oC | ||||||||||
CZPT model | Air –CZPT | Air-CZPT&H2o-CZPT | Water-CZPT | ||||||||
Discharge temperature (0C) | Ambient temperature+15oC | ||||||||||
CZPT(L) | eighteen | thirty | sixty five | ninety | 110 | ||||||
Sounds level (Db) | 68±2 | 72±2 | 75±2 | 72±2 | |||||||
CZPT method | Direct drive | ||||||||||
CZPTtricity (V/ph/Hz) | 380/3/fifty | ||||||||||
Electricity (KW/HP) | 22/30 | 37/50 | 55/75 | seventy five/100 | 90/120 | one hundred ten/a hundred and fifty | 132/175 | a hundred and fifty/200 | 185/250 | 220/three hundred | 250/350 |
CZPTting approach | Y-ΔCZPTter | ||||||||||
Dimension: duration/ width/ top (mm) |
1400* 900* 1220 |
1400* 900* 1220 |
1800* 1200* 1600 |
1900* 1200* 1600 |
2100* 1400* 1780 |
2360* 1360* 1800 |
2460* 1420* 1800 |
2560* 1540* 1840 |
2610* 1640* 2050 |
2700* 1740* 2100 |
2900* 1850* 2200 |
Bodyweight(kg) | 680 | 1060 | 1880 | 1980 | 2100 | 2900 | 3500 | 3900 | 4200 | 4600 | 5000 |
Air outlet pipe diameter (inch/mm) | one” | 1 one/two” | two” | DN65 | DN80 | DN100 |
Application
• Our products are widely utilized in energy era, semiconductor, shipbuilding, oil discipline, rubber, foods, pharmacy, bundle, digital, interaction, cement, glasses, chemical, textile, papermaking, gas, and oil refining, and many others.
Our Manufacturing unit
Business Overview
HangZhou CZPT CZPT Co., Ltd.
• Expert maker of CZPT method equipment
• Principal goods consist of CZPT Air CZPT & Piston Air CZPT
• Slicing-edge technological innovation & leading strategies: CZPT German air end with SKF bearing, Siemens/ABB electric power system and spare areas of other entire world-CZPT brands. To make certain trustworthiness, higher performance, lower noise and long daily life span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Specifics: CZPT crate pallet furthermore foam board and bubble movie, Entire shut wood circumstance. 1pcs/each and every bundle (for stationary screw CZPT)
• CZPT technique: by sea, by LCL/FCL or as requested
• Shipping and delivery method: FOB, CFR, CIF and EXW and so on.
• Supply time: in 7-fifteen days soon after receiving deposit (CZPT machines not provided)
Our Provider
Soon after-sale Service
• Any queries or requests just before, throughout or right after income, we would like to assist you any time and will uncover you the greatest resolution in 24 hrs.
• Guarantee: 1 yr for the whole device CZPT spare elements will be presented with ideal cost.
• Over board engineer services is available.
Unique CZPT Services
one) Entire OEM
• Quantity: at minimum 5 pcs
• In this program, we will do all the alterations (Colour, name plate and symbol) as your want, and will not cost additional fee.
two) Fifty percent OEM
• Quantity: no restrict
• Beneath this program, we can make the needed alteration (name plate and symbol) but we will charge some extra fee for the identify plate, as the title plate manufacturing facility has the MOQ.
3) Emblem OEM
• Amount: no limit
• Only the brand will be changed to yours, and no added charge will be billed.
Abroad Engineer Support
• We are obtainable to send our engineer for aboard support. Only need to have you to arrange the accommodation, transportation and translator. Added price for each and every will be talked about dependent on regional price level.
FAQ
Q1: Are you manufacturing facility or trade business?
A1: We are factory.
Q2: What the precisely tackle of your manufacturing facility?
A2: Our business is situated in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Warranty terms of your equipment?
A3: One particular yr warranty for the equipment and technical assistance in accordance to your wants.
This fall: Will you give some spare parts of the devices?
A4: Yes, of course.
Q5: What about item deal?
A5: We pack our items strictly with CZPT seaworthy scenario.
Q6: What about the voltage of goods?
Can they be CZPT? A6: Sure, of program. The voltage CZPT according to your equirement.
Q7: Which payment expression can you acknowledge?
A7: 40% T/T in advanced, 60% T/T from the B/L copy.
Q8: How extended will you take to prepare creation?
A8: 380V 50HZ we can supply the items inside of 7-fifteen days. Other electric power or other colour we will supply within twenty five-30 times.
Q9: Can you accept OEM orders?
A9: Indeed, with specialist design group, OEM orders are extremely welcome.
Q10: Which trade phrase can you settle for?
A10: Accessible trade terms: FOB, CIF, CFR, EXW, CPT, and many others