Emerson Evaporator Condensing Unit

Emerson Evaporator Condensing Unit

one. Cold area or chilly storage Condensing unit with CZPT Scroll CZPT introduction and complex info
one) This collection merchandise attribute box kind or open variety construction with scroll compressor, that is compact and pleasant seeking, applicable to cold exhibit instances, cold storage rooms, ice producers and so forth. 
two) The relevant temperature ranges are: 5ºC~ 15ºC,5ºC~ -5ºC and -15ºC~-25ºC. They can be employed in resorts, eating places, medicines, agricultural, substances industries all other area the place cold storage is necessary. 
 

**Mid temperature unit          
Model ESSA~ 02NJSG 03NJSG 04NJSG 05NJSG 06NJSG
Space Tem range (ºC)  -5ºC ~5ºC
Refrigerant R22
Electricity offer 380/four hundred/415V/3Ph/50 HZ
CZPT model ZB15KQ ZB21KQ ZB29KQ ZB38KQ ZB45KQ
Condenser Enthusiast qty 1 1 one 2 2
Supporter voltage (V) 220 220 220 220 220
Fan energy(W) 60 sixty sixty 60*2 60*2
Cap.&input  Te-5ºC Ability(W) 4000 5820 7810 9710 11750
Input(W) 1520 2240 2860 3610 4210
 Te-7ºC Capacity(W) 3690 5370 7220 8970 10900
Input(W) 1510 2230 2840 3590 4200
 Te-10ºC Capability(W) 3260 4740 6380 7920 9640
Input(W) 1510 2220 2830 3580 4180

Model ESSA~ 07NJSG 08NJTG 09NJTG 10NJTG 12NJTG
Place Tem variety (ºC)  -5ºC ~5ºC
Refrigerant R22
Electricity provide 380/four hundred/415V/3Ph/fifty HZ
CZPT design ZB48KQ ZB58KQ ZB66KQ ZB76KQ ZB88KQ
Condenser Enthusiast qty 2 one one one one
Enthusiast voltage (V) 220 220 220 220 220
Supporter electrical power(W) 60*2 550 550 550 550
Cap.&enter  Te-5ºC Ability(W) 12950 15100 17450 20600 23500
Enter(W) 4630 5460 6030 7130 8070
 Te-7ºC Ability(W) 12000 13850 16150 19050 21700
Enter(W) 4620 5460 6571 7110 8050
 Te-10ºC Potential(W) 10600 12000 14250 16850 19100
Enter(W) 4590 5470 5990 7070 8571

Model ESSA~ 13NJTG 15NJTG
Area Tem range (ºC)  -5ºC ~5ºC
Refrigerant R22
Energy provide 380/four hundred/415V/3Ph/fifty HZ
CZPT product ZB95KQ ZB114KQ
Condenser Enthusiast qty two two
Admirer voltage (V) 220 220
Admirer electricity(W) 460*2 460*two
Cap.&enter  Te-5ºC Capability(W) 24700 29500
Enter(W) 9110 10800
 Te-7ºC Potential(W) 22500 27000
Enter(W) 9060 1571
 Te-10ºC Potential(W) 19500 23300
Enter(W) 8990 1571

2. Condensing device Primary Factors
1. CZPT two. Condenser three. Oil heating four. Suction& discharge valves five. In/out pipe relationship six. H/L strain gauge seven. Sight glasses eight. Solenoid valve 9. Diaphragm variety force change ten. Liquid filter 11. Liquid receiver 12. liquid injection valve

three. Chilly place Condensing unit Functions
one) CZPT compressor is really reliable. It can work continuously for a very prolonged time
two) Gorgeous and sturdy physical appearance style, anti-collision and rain evidence
3) Small place occupying, hassle-free for packing and transportation
four) Effortless set up ground stand or wall hung
five) Effective and powerful admirer which has big blast quantity and minimal power usage
6) Efficient warmth transfer and extremely tranquil design, simple procedure.

four. Condensing unit collection:

A: Wall/Roof mounted monoblock condensing unit
B:Box kind Emerson CZPT compressor condensing unit
C: Box sort CZPT piston compressor condensing device
D: Open up sort CZPT piston compressor condensing device
E:Open up sort CZPT 2-phase compressor condensing device
F: CZPT Semi-airtight piston compressor racks condensing unit
G: CZPT Semi-airtight screw compressor racks condensing device
H: CZPT Semi-airtight screw compressor racks condensing device

5.About US
We, EUROSTARS, which recognized in calendar year 2006, is a modern hi-tech company, specializing in Heating Ventilation Air Conditioning and CZPT CZPT analysis, advancement, generation, revenue and engineering services.
Webiste one: http:///
Web site 2: http:///
 
Instagram: EPeurostars_aircon_refrigeration
Fb: EPpg/EurostarsCZPTR
Youtube EPchannel/UCFwKOPvrf0xSZdOzX0pB52A
 

6.FAQ
Q: What details do you want to provide in buy to get a quotation?
A: CZPTly, for condensing device we need to know subsequent objects:
-CZPT Capability, 
-Necessary chilly room temperature or evaporating temperature
-Water cooling program or air cooling system.
-CZPT manufacturer
-CZPTtrical electricity supply, this sort of as 380V-3Phase-50HZ or 440V-3Phase-60HZ
-Refrigerant, this kind of as R22 or R404a
-It is greater there are nearby ambient temperature datas
If can not give full answers for above items, we can by way of one more way, this kind of as chilly space dimension, software, etc

In buy to delivering a suitable solution and quotation for your application, make sure you consider as achievable to let us know more your specifications and software, general enquiry requests:
1. What’s the frozen goods?
two. What’s the temperature of cold room?
three. What is actually the temperature of frozen goods?
four. What’s the dimension of chilly room?(L*M*H)
five. What’s the electrical power supply?
six. Which refrigerant do you want? R22 or R404A?
seven. Which type device you favor? Scroll kind, piston type or screw sort?
8. Other needs?

7. Set up instructions and venture picture
1) The unit should be fixed at the internet site in which the air is easy to flow, and significantly away from warmth supply
2) In the storage creating, the correcting gap for the unit ought to be manufactured prior to the set up. The aspect of the gap should be made of wooden, powerful ample to assistance the unit.
three) Excellent top quality wooden should be embedded at the gap for bold fixing
four) Correct the device on the physique of the storage space with bolts
5) Seal the gap close to the device with sealing substance
6) Drainage pipe fixing: Fix the drainage pipe on the drainage mouth of the evaporator with pipe clam, make sure the route is right and the h2o could flow effortlessly
7) CZPTtrical system repairing:
(1)Check the conformity of voltage the principal energy provide to that of identify plate, the tolerance is ±10%
(2)Air swap is needed to make certain protection and overall flexibility.
(three)Grounding must be reliable
eight)Demo operation of the device
(1)Confirm that the electrical relationship is right ahead of start off the device
(two)Insert h2o to the pan of evaporator till there can be see h2o comes out from the of drainage pipe at the condenser facet
(3)Shut the air change, one moment afterwards, the indicator of the admirer and refrigeration on the handle panel will be on, implies the operation is typical. Preserve watch until finally operation is secure.

8. Product package deal and produce:
A:For chilly space device:Normal package deal f with plywood, the unit can be effectively safeguarded, it is with pallet on the base for easy transportation.,
the unit can be nicely secured ,suited for container shipment. 
B:For chilly area panel:CZPT movie for panel, Each panel is nicely wrapped with plastic movie respectively, the corner is protected with brown paper. 

 

Emerson Evaporator Condensing Unit