China Provider Conserve forty% CZPT High Performance Special Developed Elgi Air CZPT Design CZPT CZPT 45kw
Solution Data
Features Of Belt CZPTn CZPT Air CZPT
1 . Air end with large-efficiency
two. Double CZPT with reduced noise, Tremendous Silenced Enclosure
three. Stylish compact layout. Fully open accessibility doorway to internal components for effortless services.
four. 100% Constant obligation procedure. Load/No Load procedure
5. Higher high quality CE Certificate industrial electric powered motors. ISO,CE,UL Certificate
six. Easy to use and read through Lcd control panel
seven. Higher temperature, substantial stress and anti-rotation shutdown
8. CZPT successful procedure
nine. 5 micron, water-resistant air filtration substance
10. 1year entire equipment warranty,3years air conclude warranty.
11. CZPT the equipment with diverse operating voltage according to customer’s request,
such as: 380Volt,3phase,50hz
420Volt,3phase,50hz
380Volt,3phase,60hz
220Volt,3phase and 60hz, and many others.
AIRHORSE SCREW AIR CZPT (BELT Pushed) |
Model |
AHB-7A |
AHB-10A |
AHB-15A |
AHB-20A |
AHB-25A |
AHB-30A |
AHB-40A |
AHB-50A |
AHB-60A |
AHB-75A |
AHB-100A |
Totally free air produce/ Discharge stress (m3/min/Mpa) |
.85/.seven .seventy five/.8 |
one.2/.seven one.1/.8 .nine/1. .7/one.2 |
1.six/.seven one.5/.8 one.three/1. 1.one/one.two |
2.five/.seven 2.three/.eight two.one/1. one.9/one.2 |
3.2/.seven two.9/.8 2.6/1. two.two/1.two |
three.8/.7 3.6/.8 3.two/1. two.8/one.2 |
five.two/.seven five./.eight four.five/one. 3.8/1.2 |
six.8/.seven six.two/.8 five.six/1. 4.9/one.2 |
7.3/.seven seven./.eight six./one. five.6/one.two |
10./.seven nine.one/.8 8.5/1. 7.6/one.two |
thirteen.5/.seven twelve.six/.8 eleven.two/one. 10./1.two |
Free of charge air deliver/ Discharge pressure (CFM/PSI) |
30/102 27/116 |
forty two/102 39116 32/one hundred forty five twenty five/174 |
fifty seven/102 53/116 46/one hundred forty five 39/174 |
88/102 81/116 seventy four/a hundred forty five sixty seven/174 |
113/102 102/116 ninety two/145 seventy eight/174 |
134/102 127/116 113/a hundred forty five ninety nine/174 |
184/102 177/116 159/one hundred forty five 134/174 |
240/102 219/116 198/one hundred forty five 173/174 |
258/102 247/116 212/one hundred forty five 198/174 |
353/102 322/116 three hundred/one hundred forty five 269/174 |
477/102 445/116 396/one hundred forty five 353/174 |
No.of compression phase |
single phase |
Ambient temperature |
-5–+45°c |
CZPT model |
Air –CZPT |
Discharge temperature (°c) |
Ambient temperature+15°c |
CZPT(L) |
16 |
18 |
thirty |
65 |
Sounds amount(Db) |
62±2 |
64±2 |
62±2 |
68±2 |
72±2 |
CZPT technique |
Multivee belt |
CZPTtricity (V/ph/Hz) |
380/three/50 |
Electrical power (KW/HP) |
5.five/7 |
seven.five/10 |
11/15 |
15/20 |
eighteen.5/twenty five |
22/thirty |
thirty/forty |
37/fifty |
45/sixty |
fifty five/seventy five |
75/a hundred |
CZPTting strategy |
Y-ΔCZPTter |
Dimension: duration/ width/ top(mm) |
800* 720* 950 |
860* 740* 960 |
1100* 850* 1160 |
1400* 950* 1300 |
1500* a thousand* 1420 |
1730* 1170* 1700 |
1820* 1250* 1760 |
Weight(kg) |
128 |
240 |
400 |
420 |
600 |
620 |
680 |
980 |
1050 |
1600 |
1800 |
Air outlet pipe diameter (inch/mm) |
three/4″ |
1″ |
1 one/two” |
two” |
Software
• Our products are broadly utilised in electricity generation, semiconductor, shipbuilding, oil subject, rubber, foods, pharmacy, package, digital, conversation, cement, eyeglasses, chemical, textile, papermaking, gasoline, and oil refining, and so on.
Our Manufacturing facility
Business Overview
HangZhou CZPT CZPT Co., Ltd.
• Skilled producer of CZPT method products
• Main goods contain CZPT Air CZPT & Piston Air CZPT
• Chopping-edge engineering & leading strategies: CZPT German air finish with SKF bearing, Siemens/ABB electrical energy program and spare areas of other globe-CZPT brand names. To guarantee dependability, high performance, reduced noise and extended existence span
CZPT & CZPT
CZPT and CZPT and Payment
• Packing Details: CZPT crate pallet furthermore foam board and bubble film, Total shut picket circumstance. 1pcs/every package (for stationary screw CZPT)
• CZPT method: by sea, by LCL/FCL or as requested
• Shipping and delivery approach: FOB, CFR, CIF and EXW etc.
• Supply time: in 7-fifteen times following receiving deposit (CZPT devices not provided)
Our Service
Following-sale Provider
• Any inquiries or requests just before, throughout or after income, we would like to help you any time and will discover you the best answer in 24 several hours.
• Warranty: 1 year for the complete device CZPT spare parts will be supplied with ideal value.
• More than board engineer provider is offered.
Particular CZPT Support
1) Complete OEM
• Amount: at the very least 5 pcs
• In this prepare, we will do all the alterations (Colour, title plate and symbol) as your need, and will not demand additional charge.
two) Half OEM
• Quantity: no limit
• Below this plan, we can make the necessary alteration (title plate and emblem) but we will charge some extra fee for the title plate, as the title plate manufacturing facility has the MOQ.
3) Logo OEM
• Quantity: no limit
• Only the symbol will be modified to yours, and no further fee will be charged.
Abroad Engineer Provider
• We are available to send out our engineer for aboard services. Only require you to set up the lodging, transportation and translator. Extra price for each and every will be mentioned primarily based on neighborhood price level.
FAQ
Q1: Are you factory or trade firm?
A1: We are manufacturing unit.
Q2: What the exactly handle of your manufacturing unit?
A2: Our firm is found in CZPT CZPT Park, CZPT District, HangZhou, ZheJiang , China
Q3: Guarantee phrases of your machine?
A3: 1 calendar year guarantee for the device and technological assist in accordance to your needs.
This fall: Will you give some spare areas of the devices?
A4: Yes, of course.
Q5: What about item package?
A5: We pack our products strictly with CZPT seaworthy scenario.
Q6: What about the voltage of merchandise?
Can they be CZPT? A6: Sure, of course. The voltage CZPT in accordance to your equirement.
Q7: Which payment term can you accept?
A7: forty% T/T in advanced, sixty% T/T from the B/L duplicate.
Q8: How prolonged will you consider to arrange production?
A8: 380V 50HZ we can delivery the goods in seven-15 days. Other electric power or other colour we will delivery in 25-30 days.
Q9: Can you take OEM orders?
A9: Yes, with specialist style crew, OEM orders are highly welcome.
Q10: Which trade term can you settle for?
A10: Obtainable trade terms: FOB, CIF, CFR, EXW, CPT, and so forth