Technical Information of Immediate CZPT CZPTtric Motor CZPT Air CZPT
Product | Doing work Strain | Ability | Motor Energy | CZPTn Strategy | CZPT Technique | Dimension(mm) | Web Bodyweight | Air Outlet Pipe Diameter | ||||
Psi | bar | Cfm | m3/min | kw/hp | L | W | H | KGS | ||||
SGD08 | 102 | 7 | 42.four | 1.two | 7.five/ten | Direct CZPT | Air CZPT / Drinking water CZPT |
900 | 670 | 850 | two hundred | one/2” |
116 | eight | 38.8 | 1.one | |||||||||
a hundred forty five | 10 | 33.5 | .ninety five | |||||||||
174 | twelve | 28.three | .8 | |||||||||
SGD11 | 102 | 7 | fifty eight.three | one.65 | 11/15 | 1080 | 750 | 1571 | 280 | 3/4” | ||
116 | 8 | fifty three. | one.5 | |||||||||
145 | ten | 45.9 | 1.3 | |||||||||
174 | twelve | 38.eight | one.1 | |||||||||
SGD15 | 102 | 7 | 88.3 | two.5 | fifteen/twenty | 1080 | 750 | 1571 | 300 | 3/4” | ||
116 | eight | eighty one.two | 2.3 | |||||||||
145 | 10 | seventy four.two | 2.one | |||||||||
174 | 12 | sixty seven.one | 1.nine | |||||||||
SGD18 | 102 | seven | 113. | 3.2 | eighteen.5/25 | 1380 | 850 | 1185 | 430 | 1” | ||
116 | eight | 105.9 | 3. | |||||||||
one hundred forty five | ten | 95.three | 2.7 | |||||||||
174 | 12 | eighty four.seven | two.four | |||||||||
SGD22 | a hundred | 7 | 134.2 | 3.8 | 22/thirty | 1380 | 850 | 1185 | 450 | 1” | ||
116 | 8 | 127.one | 3.six | |||||||||
145 | ten | 113. | three.2 | |||||||||
174 | 12 | 95.three | two.seven | |||||||||
SGD30 | 102 | 7 | 187.one | five.3 | thirty/40 | 1380 | 850 | 1185 | five hundred | 1” | ||
116 | eight | 176.six | 5. | |||||||||
one hundred forty five | ten | 158.nine | four.five | |||||||||
174 | 12 | 141.two | four. | |||||||||
SGD37 | 102 | 7 | 240.one | six.8 | 37/fifty | 1500 | 1000 | 1345 | 650 | 11/two” | ||
116 | 8 | 218.9 | 6.2 | |||||||||
one hundred forty five | ten | 197.seven | five.6 | |||||||||
174 | twelve | 176.six | 5. | |||||||||
SGD45 | 102 | seven | 261.3 | 7.four | forty five/60 | 1500 | one thousand | 1345 | 680 | eleven/two” | ||
116 | eight | 247.2 | seven. | |||||||||
one hundred forty five | 10 | 218.nine | six.2 | |||||||||
174 | 12 | 197.7 | five.6 | |||||||||
SGD55 | 102 | 7 | 353.one | 10. | 55/seventy five | 1800 | 1250 | 1670 | 1150 | 2″ | ||
116 | 8 | 339. | 9.6 | |||||||||
a hundred forty five | ten | 300.1 | eight.five | |||||||||
174 | 12 | 268.4 | seven.6 | |||||||||
SGD75 | 102 | 7 | 473.2 | 13.4 | 75/a hundred | 1800 | 1250 | 1670 | 1200 | 2″ | ||
116 | 8 | 444.9 | 12.six | |||||||||
one hundred forty five | ten | 395.five | eleven.2 | |||||||||
174 | twelve | 353.1 | 10. | |||||||||
SGD90 | 102 | seven | 572. | 16.two | 90/a hundred and twenty | 1800 | 1250 | 1670 | 1350 | 2″ | ||
116 | eight | 529.7 | 15. | |||||||||
one hundred forty five | 10 | 487.3 | 13.8 | |||||||||
174 | twelve | 434.3 | twelve.3 | |||||||||
SGD110 | 102 | seven | 741.5 | 21. | a hundred and ten/one hundred fifty | 2300 | 1470 | 1840 | 1800 | 2 1/2” | ||
116 | eight | 699.one | 19.eight | |||||||||
a hundred forty five | ten | 614.4 | 17.four | |||||||||
174 | twelve | 522.six | 14.eight | |||||||||
SGD132 | 102 | 7 | 865.one | 24.five | 132/one hundred seventy five | 2300 | 1470 | 1840 | 1850 | two one/2” | ||
116 | 8 | 819.two | 23.2 | |||||||||
one hundred forty five | 10 | 723.9 | 20.5 | |||||||||
174 | 12 | 614.4 | seventeen.four | |||||||||
SGD160 | 102 | 7 | 1013.four | 28.seven | a hundred and sixty/two hundred | 2300 | 1470 | 1840 | 2000 | 2 1/2” | ||
116 | 8 | 974.6 | 27.6 | |||||||||
a hundred forty five | ten | 868.6 | 24.six | |||||||||
174 | 12 | 759.two | 21.five | |||||||||
SGD185 | 102 | 7 | 1129.nine | 32. | 185/250 | 3150 | 1980 | 2152 | 3500 | DN85 | ||
116 | eight | 1073.4 | 30.four | |||||||||
one hundred forty five | ten | 967.5 | 27.four | |||||||||
174 | 12 | 875.seven | 24.eight | |||||||||
SGD220 | 102 | seven | 1271.two | 36. | 220/three hundred | 3150 | 1980 | 2152 | 3800 | DN85 | ||
116 | eight | 1211.1 | 34.3 | |||||||||
one hundred forty five | 10 | 1066.four | 30.2 | |||||||||
174 | twelve | 978.one | 27.7 | |||||||||
SGD250 | 102 | seven | 1483. | forty two. | 250/350 | 3150 | 1980 | 2152 | 4000 | DN85 | ||
116 | eight | 1430.1 | forty.five | |||||||||
a hundred forty five | ten | 1348.8 | 38.2 | |||||||||
174 | 12 | 1218.2 | 34.five | |||||||||
SGD315 | 102 | 7 | 1800.eight | fifty one. | 315/430 | 4000 | 1980 | 2152 | 6000 | DN110 | ||
116 | eight | 1772.six | fifty.2 | |||||||||
one hundred forty five | 10 | 1571.three | 44.5 | |||||||||
174 | twelve | 1412.four | forty. | |||||||||
SGD355 | 102 | seven | 2259.8 | 64. | 355/480 | 4000 | 1980 | 2152 | 6500 | DN110 | ||
116 | 8 | 2153.9 | 61. | |||||||||
145 | ten | 1995. | fifty six.five | |||||||||
174 | 12 | 1730.two | 49. | |||||||||
CZPTting Manner: Y-△ Motor CZPT Course: IP23/IP54/IP55 or as per your required Voltage: 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests. |
Q1: What is the rotor velocity for the air conclude?
A1: 2980rmp.
Q2: What’s your lead time?
A2: usually, 5-7 days. (OEM orders: 15days)
Q3: Can you offer water cooled CZPT?
A3: Yes, we can (usually, air cooled kind).
This autumn: What’s the payment term?
A4: T/T, L/C, CZPT CZPT, etc. Also we could accept USD, RMB, and other currency.
Q5: Do you accept CZPT voltage?
A5: Yes. 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests.
Q6: What is your warranty for CZPT?
A6: One year for the whole CZPT(not which includes the intake spare areas) and technical supports can be presented according to your requirements.
Q7: Can you accept OEM orders?
A7: Sure, OEM orders are warmly welcome.
Q8: How about your customer service and after-sales service?
A8: 24hrs on-line support, 48hrs problem solved promise.
Q9: Do you have spare parts in stock?
A9: Yes, we do.
Q10: What kind of initial lubrication oil you used in CZPT?
A10: TOTAL 46# mineral oil.