CZPT Parameter of CZPT
CZPT Title | Gas-Liquid Booster Pump | |
Model | M-four | |
Booster Medium | Lquid | |
Force ratio | 4:one | |
Outlet pressure | 32bar | |
464 psi | ||
Flow L/Min | 14.eighty one | |
connections | CZPT connection | G3/8” |
Inlet | OG1” | |
Outlet | ZG1/2” | |
Web bodyweight KG | 4.8 | |
CZPT instances | Export CZPT fumigation wooden situations |
Solution introduction
M-Sequence air pushed liquid pump employs a developed-in pneumatic manage four-way two-situation valve to move to and fro instantly. This series of item is developed by introducing relevant technological innovation abroad and designing in accordance to the CZPTs of our region. The air driven parts are all created of aluminum alloy and are treated with oxidation. The pump head is made of carbon metal or stainless steel according to various media.
Merchandise Information
The diameter of the push piston of this series is up to 80mm, air pressure≤8bar.
This type of pumps has the pursuing traits:
Mild excess weight, portable design
Massive stream, extensive strain assortment
Apt to control, each handbook and computerized controls are obtainable.
Acceptable for most fluid
No electrical power is necessary.
Easy to maintain
Primary specialized data
Typical specialized data for M sequence air driven- booster pump
Type | Force ratio | Outlet stress | Stream 1/Min |
Connections | Net excess weight KG | |||
bar | psi | push connection | Inlet | Outlet | ||||
M4 | 4:one | 32 | 464 | fourteen.81 | G3/eight” | G1″ | ZG1/two” | four.eight |
M10 | ten:1 | 80 | 1160 | 7.07 | G3/8″ | ZG3/four” | ZG1/2″ | 4.three |
M16 | 16:1 | 128 | 1856 | 4.55 | G3/eight” | ZG1/2″ | ZG1/two” | four.2 |
M30 | thirty:1 | 240 | 3480 | 2.22 | G3/eight” | ZG1/2″ | ZG3/eight” | four.two |
M44 | forty four:one | 352 | 5104 | one.36 | G3/8″ | ZG3/8″ | ZG3/8″ | four.1 |
M64 | sixty four:one | 512 | 7424 | .72 | G3/eight” | ZG3/8″ | ZG3/eight” | 4.1 |
M100 | 100:1 | 800 | 11600 | .48 | G3/eight” | ZG3/8″ | M14X1.5 | 4.one |
M170 | a hundred and seventy:1 | 1360 | 19720 | .28 | G3/eight” | ZG3/eight” | M14X1.five | four.one |
Our manufacturing unit
FAQ
one. Shipping CZPT: FOB HangZhou, by vessel
two. Delivery Time: 15-20 days
three. Payment CZPTs: T/T (100% to pay by T/T )
four. Set up / Operation / Support / Manual: In English
five. Warranty: A single 12 months from the date of completion of the commissioning.
6. Pre-cargo Inspection: Provider should trial run entire line at supplier’s manufacturing facility before cargo.
About transport
Fumigation wood situations, which are nicely sealed and powerful ample for long-expression trip, and appropriate for multi-instances loading & unloading by forklift.