CZPT Saving Low Stress Variable frequency screw CZPT
Rewards of lower strain CZPT:
one. Specially made for the low force price use need.
two. Adopt the most superior engineering and world CZPT manufacturer of twin screw main equipment in creating and production, no leakage, make sure higher air discharge and low power consumption.
three. Substantial high quality electric powered motor with SKF bearing, IP54, hassle-free servicing and long use existence.
four. Undertake globe CZPT model of air intake filter, oil filter, air and oil separator, recognize high filtration precision, compressed air oil content material below 3ppm, attain to global superior CZPT level.
5. Equip with the most innovative air manage system. Undertake air ingestion valve, smart management method and stress sensor mixed control technique, can function by ON and OFF two position, stepless air potential manage technique, time-hold off quit and automatically begin unit three air capability control strategy, fulfill different clientele need.
six. CZPT microcomputer control technique, Chinese and English language procedure interface, malfunction exhibit, alarm and machine quit automatically.
seven. Undertake high high quality and globe CZPT brand name of major factors like Uk APD oil filter, CZPTica AMOT temperature managing valve, SCHNEIDER electrical components and and so forth..
Parameters of our minimal stress CZPT:
Product | Kind | Air displacemen (m3/min) | Exhause stress (Mpa) | Noise (dBa) | Energy (Kw) | Outlet pipe size | Proportions (mm) | Excess weight (Kg) |
LG(F)D-90-d | LG(F)D-18.7/three.5 | eighteen.7 | .35 | 90 | DN80 | 2450*1800*1820 | 3225 | |
LG(F)D-seventeen.9/four. | seventeen.nine | .four | ||||||
LG(F)D-17.3/4.5 | seventeen.3 | .45 | ||||||
LG(F)D-fifteen.8/five. | 15.8 | .5 | ||||||
LG(F)D-110-d | LG(F)D-24.1/three.5 | 24.1 | .35 | 78±3 | a hundred and ten | DN80 | 3150*2050*2210 | 4050 |
LG(F)D-22.1/4. | 22.one | .four | ||||||
LG(F)D-21.8/four.five | 21.eight | .forty five | ||||||
LG(F)D-twenty.9/five. | 20.nine | .5 | ||||||
LG(F)D-132-d | LG(F)D-30.2/three.5 | 30.two | .35 | 132 | DN80 | 3150*2050*2210 | 4050 | |
LG(F)D-27.6/4. | 27.6 | .4 | ||||||
LG(F)D-25.seven/4.five | 25.7 | .forty five | ||||||
LG(F)D-24./5. | 24 | .5 | ||||||
LG(F)D-one hundred sixty-d | LG(F)D-33.seven/three.5 | 33.7 | .35 | 160 | DN125 | 3150*2050*2210 | 5500 | |
LG(F)D-thirty.five/4. | thirty.five | .four | ||||||
LG(F)D-thirty./4.five | 30 | .forty five | ||||||
LG(F)D-29.6/five. | 29.six | .5 | ||||||
LG(F)D-185-d | LG(F)D-41./3.five | 41 | .35 | 80±3 | 185 | DN125 | 3750*2120*2340 | 7000 |
LG(F)D-39./4. | 39 | .4 | ||||||
LG(F)D-36./4.5 | 36 | .45 | ||||||
LG(F)D-35.eight/5. | 35.8 | .five | ||||||
LG(F)D-two hundred-d | LG(F)D-43.three/three.5 | forty three.3 | .35 | 200 | DN125 | 3850*2120*2340 | 7000 | |
LG(F)D-41./four. | 41 | .4 | ||||||
LG(F)D-forty.five/4.5 | forty.five | .forty five | ||||||
LG(F)D-38.seven/5. | 38.7 | .five | ||||||
LG(F)D-220-d | LG(F)D-47./3.five | 47 | .35 | 80±3 | 220 | DN150 | 3850*2120*2340 | 7000 |
LG(F)D-forty three.two/4. | forty three.2 | .4 | ||||||
LG(F)D-42.5/4.5 | 42.5 | .forty five | ||||||
LG(F)D-forty.four/five. | forty.four | .5 |
Our factory and workshop:
Soon after revenue provider for our air screw compressor solution:
one. Supplying expert air compression plan creating for totally free.
2. Delivering our factory CZPT device elements at cheapest value following equipment revenue.
3. Offering training and assistance for free, consumers can ship their personnel to our manufacturing facility to understand how to work the machines.
four. Guarantee interval: the screw principal machine is a single year, the bearing is a single 12 months, the wear elements of air ingestion valve, electric powered factors, electromagnetic valve, charge valve are 6 months
five. The air filter, oil filter, oil-drinking water separator, lubricating oil, rubber areas and etc. are not provided in warranty selection.
Certification and patents of our CZPT
FAQ:
Q1: Are you factory or trade organization?
A1: We are manufacturing unit.
Q2: Warranty conditions of your equipment?
A2: One yr warranty for the machine and technological assistance according to your demands.
Q3: Will you give some spare parts of the machines?
A3: Yes, of system.
This autumn: How long will you take to set up generation?
A4: 380V 50HZ we can shipping and delivery the goods inside of 20 times. Other electrical power or other coloration we will shipping inside of 30 times.
Q5: Can you take OEM orders?
A5: Yes, with professional design team, OEM orders are highly welcome!