We can customise diverse varieties of chillers and central air conditioners in accordance to customer request, welcome to speak to us for specifics, we will supply expert remedies for you.
3HP 5HP 8HP 10HP CZPT use Air cooled Modest Scroll Water Chiller
SHR collection scroll chillers undertake the substantial top quality scroll compressors, electrical and refrigeration system parts. With friendly interface, it is easy for user to operation. All CZPTR chillers are manufacturing facility analyzed underneath load situations to ensure easy set up for end users. The cooling assortment of this series from 8900 kcal to 145900 kcal (3HP-45HP), and the chilled drinking water temperature ranges from 5°C to 20 °C. The device is equipped with numerous safety protection gadgets, and the factors are comprehensive and trustworthy, which can exert the greatest result in actual working conditions.
Characteristic
one. Substantial Efficiency
Ø Using large effectiveness scroll compressor, low electrical power consumption, large cooling capacity.
Øhell and tube condenser and evaporator, substantial effectiveness, straightforward to clear, stay away from condenser higher strain and evaporator freezing.
2.Reliable procedure
Ø seven safeguards can ensure the chiller secure procedure.
Ø The chiller is made for multi-circuit and multi-compressor. When a single compressor fails, the other compressor can nonetheless run usually.
3. CZPT Manage
Ø CZPT microcomputer controller, supplies most basic and thoughtful procedure interface, ship suggestions of routine maintenance details well timed.
Ø The chiller management system can be linked to the user’s central manage technique, consumer can examine the procedure position at any time.
four. Effortless Set up and Routine maintenance
Ø The chiller is crammed with refrigerant and lubricating oil before leaving the manufacturing unit. The user only needs to connect the inlet and outlet pipes and the power offer to run.
Ø The manage interface directly shows the fault merchandise, which is hassle-free for timely know the faults and elimination.
five. Give CZPT provider
Ø We provide R22, R407, R134a refrigerant options in accordance to buyer needs.
Ø We can also generate other
power supply chillers and
special models this kind of as anti-corrosion
and explosion-evidence
in accordance to buyer need.
Specification
Model SHR- | 03AI | 05AI | 08AI | 10AI | twelve.5AI | 15AI | |||||||||||||
Refrigerant | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | |
Nominal CZPT Capability | ×1000kcal/h | 8.five | eight.one | 5.six | twelve.6 | 12.three | eight.7 | 20.four | twenty.2 | 13.3 | 27.one | 26.four | 18 | thirty.nine | 30.three | 20.four | 39.seven | 38.6 | 26.seven |
KW | nine.nine | nine.4 | six.five | fourteen.7 | fourteen.3 | ten.one | 23.seven | 23.five | 15.5 | 31.5 | thirty.seven | 20.nine | 35.9 | 35.two | 23.seven | 46.two | 44.9 | 31.1 | |
Enter electricity(kw) | 3.forty nine | three.49 | 2.69 | five.03 | four.ninety three | 3.sixty three | 8.38 | eight.forty eight | 6.48 | 11 | 10.9 | 8.22 | 12 | 11.9 | 9.twelve | 15.three | 15.3 | eleven.five | |
Comp.enter Electricity (KW×QTY) | 2.7×1 | two.7×1 | 1.9×1 | 4.1×1 | 4×1 | two.7×1 | six.1×1 | 6.2×1 | 4.2×1 | eight.2×1 | 8.1×1 | 5.4×1 | 9.2×1 | nine.1×1 | six.3×1 | twelve.4×1 | 12.4×1 | 8.6×1 | |
Chilled Drinking water pump Design | 1DK20 | 1DK20 | GD40-twenty | GD40-twenty | GD40-20 | GD50-17 | |||||||||||||
Chilled H2o pump electricity(KW) | .55 | .fifty five | one.5 | 1.five | 1.5 | one.5 | |||||||||||||
Comp.existing(A) | six.6 | six.7 | 5.5 | 9.57 | 9.75 | 7.sixty five | sixteen.7 | seventeen.1 | fourteen.8 | twenty.6 | 20.seven | seventeen.five | 22.2 | 22.two | seventeen.9 | 30.eight | 31.seven | 28.2 | |
Power CZPT | 3Phase-380V-50Hz | ||||||||||||||||||
CZPT Device | Reverse section defense,stage decline security,overcurrent defense,substantial and minimal voltage security,low temperature protection,h2o movement defense | ||||||||||||||||||
Quantity Of CZPT Circuit | 1 | ||||||||||||||||||
Potential Manage(%) | ,a hundred | ||||||||||||||||||
Condenser | Ripple Aluminum Finsaround Copper pipe | ||||||||||||||||||
Energy input of Enthusiast(KW) | .24 | .38 | .seventy eight | 1.32 | one.32 | one.4 | |||||||||||||
Evaporator | Coil type | Shell-and-Tube Type | |||||||||||||||||
Water Side max Force(MPa) | one | ||||||||||||||||||
Dia.of pipe to Evaporator(inch) | 1″ | 1″ | 1-one/2″ | 1-one/2″ | one-one/2″ | 2″ | |||||||||||||
CZPT Drinking water Movement(L/min) | 28.four | 26.nine | eighteen.6 | 42.one | 41 | 29 | 67.9 | 67.4 | 44.4 | ninety.three | 88 | 60 | 103 | 101 | sixty seven.nine | 132 | 129 | 89.2 | |
Evaporator Water Strain fall(kPa) | _ | _ | seventeen | 23 | 28 | 30 | |||||||||||||
Working noise Db(A) | seventy two | seventy two | seventy five | seventy five | 75 | 75 | |||||||||||||
Tank Quantity(L) | 80 | eighty | one hundred eighty | one hundred eighty | 180 | 180 | |||||||||||||
Total Bodyweight(kg) | a hundred thirty | one hundred seventy | 430 | 470 | 510 | 560 |
Model SHR- | 20AI | 25AI | 30AI | 40AI | 45AI | |||||||||||
Refrigerant | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | R22 | R407C | R134a | |
Nominal CZPT Capability | ×1000kcal/h | 54.two | fifty two.eight | 35.9 | 61.seven | 60.five | forty.8 | 81.3 | 79.two | 53.9 | 92.6 | 90.eight | sixty one.1 | 119.2 | one hundred fifteen.eight | 80.2 |
KW | sixty three | 61.four | forty one.eight | 71.eight | 70.four | 47.4 | ninety four.5 | ninety two.1 | 62.seven | 107.7 | a hundred and five.six | 71.one | 138.5 | 134.seven | 93.three | |
Input electricity(kw) | twenty.54 | 20.34 | fourteen.94 | 22.fifty four | 22.34 | 16.seventy four | thirty.seventy six | thirty.46 | 22.36 | 33.76 | 33.46 | 25.06 | forty three.6 | 43.6 | 32.2 | |
Comp.enter Power (KW×QTY) | 8.2×2 | eight.1×2 | five.4×2 | nine.2×2 | nine.1×2 | 6.3×2 | 8.2×3 | eight.1×3 | five.4×3 | 9.2×3 | 9.1×3 | six.3×3 | twelve.4×3 | twelve.4×3 | 8.6×3 | |
Chilled H2o pump Model | GD50-seventeen | GD50-seventeen | GD65-19 | GD65-19 | GD65-19 | |||||||||||
Chilled Water pump electricity(KW) | one.5 | one.5 | two.2 | two.2 | 2.2 | |||||||||||
Comp.recent(A) | 37.eight | 38 | 31.6 | 41 | forty one | 32.4 | fifty six.3 | 56.6 | forty seven | 61.one | sixty one.one | 48.two | 86.nine | 89.6 | 79.1 | |
Energy CZPT | 3Phase-380V-50Hz | |||||||||||||||
CZPT Gadget | Reverse phase safety,phase decline security,overcurrent security,substantial and minimal voltage security,reduced temperature security,drinking water stream safety | |||||||||||||||
Quantity Of CZPT Circuit | two | 3 | ||||||||||||||
Capacity Manage(%) | ,50,one hundred | ,33,66,one hundred | ||||||||||||||
Condenser | Ripple Aluminum Finsaround Copper pipe | |||||||||||||||
Electrical power input of Fan(KW) | 2.64 | 2.sixty four | three.ninety six | three.ninety six | 4.two | |||||||||||
Evaporator | Shell-and-Tube Variety | |||||||||||||||
Water Aspect max Force(MPa) | one | |||||||||||||||
Dia.of pipe to Evaporator(inch) | 2″ | 2″ | 2-one/2″ | 2-one/2″ | 2-1/2″ | |||||||||||
CZPT H2o Stream(L/min) | 180.6 | 176 | 119.8 | 205.eight | 201.8 | a hundred thirty five.nine | 270.9 | 264 | 179.7 | 308.seven | 302.seven | 203.8 | 397 | 3861 | 267.5 | |
Evaporator H2o Stress fall(kPa) | 28 | 28 | 32 | 32 | 31 | |||||||||||
Operating noise Db(A) | 75 | 75 | 75 | seventy five | 75 | |||||||||||
Tank Quantity(L) | 270 | 270 | 270 | 270 | 270 | |||||||||||
Overall Weight(kg) | 840 | 880 | 980 | 1130 | 1280 | |||||||||||
Notice: | ||||||||||||||||
one. Nominal cooling capacity primarily based on: Air dry/soaked bulb temperature 35°C/24°C, Evaporator inlet and outlet water temperature 17ºC/12ºC, Fouling coefficient .088.ºC/KW two. Chilled h2o temperature variety: 5ºC ~ 20ºC R134a: 5ºC ~ 25ºC three. Ambient temperature range: 5ºC~43ºCR134a:5ºC~50ºC 4. Requirements and dimensions will be subject to adjust with out notice. |
Applications
There are a lot of variables impacting the refrigeration plan. Every single plan has its very own advantages and drawbacks. From the point of view of thermodynamics, what is pursued is the rationality of the power employed in the program (power amount utilization system) and perfection—cooling application performance From an economic level of view, the technique is required to obtain the highest revenue with a least expense. From the point of view of thermal economics, CZPT researches the quantitative evaluation index of thermal financial coefficient, and utilizes this index to optimize the industrial refrigeration scheme to propose the most affordable vitality-preserving industrial refrigeration method remedy.
CZPT industrial chiller major application sector:
one. CZPT molding, injection molding, extrusion molding, blowing, thermoforming, pipe, profile, BOPP movie, plastic sheet
2. CZPT, chemical fiber, pharmaceutical, meals processing, cosmetics, wine, paper, printing
three. CZPT reducing, non-slicing, casting
four. Laser technological innovation, welding, area treatment method, electroplating, electrophoresis
5. CZPT tools, electronics industry, circuit board creation, electronic chip production
6. Aluminum profile, aluminum alloy, tempered glass, coated glass manufacturing
seven. CZPTsonic cleaning, jewelry processing
8. CZPT, fur processing, ink manufacturing
9. Photo voltaic photovoltaic, concrete watering, electricity
10. Greenhouse planting, aquaculture, and many others.
About CZPTR
CZPT Freezing CZPTry (HangZhou)Co., Ltd. is a joint venture which was proven by domestic Huizhuo and Japan Ronghe corporation with a total expense of fifty million Yuan in 2017. It positioned in HangZhou CZPT and Technological CZPT Zone. Combined with Japan R&D centre and ZheJiang University of CZPT, We are dedicated to industrial chiller, central air conditioner, magnetic centrifugal chiller R&D and manufacture.
Manufacturing facility Show
We have our very own laboratories and prefessional testing Line. All CZPTR chillers are manufacturing unit tested underneath load circumstances to guarantee effortless installation for consumers.
Our Major Solution:
1) CZPTic Bearing Centrigufal Chiller
2) Drinking water cooled CZPT Chiller, Air cooled screw Chiller, Flooded kind CZPT Chiller, Evaporative Cooled CZPT Chiller
3) H2o cooled Scroll Chiller, Air cooled Scroll Chiller
4) Water-cooled Packaged air conditioner, Air-cooled Packaged air conditioner, thoroughly clean constant temperature and humidity air conditioner, CZPT air conditioning
five) Minimal temperature chiller(0ºC to -50ºC)
6) Anti-corrosion Chiller, Explosion-evidence Chiller, etc
Situations
Certificates
CE&ISO9001&ISO14001&BV&AHRI
Packing&CZPT
CZPT movie+CZPT export plywood circumstance with forklift truck feet, straightforward to load and unload
CZPT by sea, by truck, or by train
After-revenue provider
12 months good quality guarantee considering that the date of shipping and delivery.
Cost-free of cost to exchange new chillersif high quality issues.
Price price to acquire extra components with Chillers from CZPTr if required.
Video specialized assistance
On the internet help(Electronic mail, Skype, Wechat, Whatsapp, Telephone…)
Engineers accessible to services equipment abroad if necessary
Essential data to Quotation
one. What is your cooling potential? _____ Kcal/hr or _____KW or _____RT?
2. What is actually your electricity supply? For illustration: 3800V-50Hz-3N (N=Stage )
three. What refrigerant variety do you demand? R22 or R134a or R407c?
four. What is your ambient temperature? And what is your chiller inlet and outlet water temperature?
five. Which business do you use the chiller in?
FAQ
Q1: Are you a manufacturer?
A1: Of course, we have more than ten a long time in h2o chiller company. New plant was bulit in 2017 in HangZhou CZPT&Technological CZPT Zone. Welcome to go to us at any time!
Q2: Could you support us to advise the model for our venture?
A2: Indeed, we have engineer to check the information and make the plan for you. Based on the pursuing:
one)CZPT capacity
2) Refrigerant
3) Ambient temperature
four)Voltage
five) For what business
6)The creating drawing(if you have)
7)Any other specific needs.
Q3: How to ensure your solution with good high quality?
A3: We use the properly-know brand name add-ons, such as CZPT, CZPT, danfoss compressor, Emerson enlargement Valve, Siemens controller. All CZPTR chillers are factory tested under load conditions to ensure very good high quality and simple installation for customers.
This fall: What is actually the warrenty?
A4: 1 year warrenty for free of charge if verified by both facet harm in the quality explanation.
Q5: Whats your payment expression?
A5: We accept TT, LC, CZPT CZPT, and so forth. Usually, 30% deposit for generation, 70% harmony before cargo.
Q6: How can I place an buy?
A6: Contact us via produced in China or get in touch with beneath information.
Ms. Livia
Tel: 13595716431