Design | Functioning Stress | Capability | Motor Power | CZPTn Method | CZPT Technique | Dimension(mm) | Web Fat | Air Outlet Pipe Diameter | CZPTting Method | Sounds dB(A) |
Air tank | ||||
Psi | bar | Cfm | m3/min | kw/hp | L | W | H | KGS | |||||||
SGAT08 | 102 | 7 | 42 | one.2 | 7.5/ten | Direct CZPT | Air CZPT | 1900 | 720 | 1470 | 420 | one/two” | comfortable start | sixty two ±2 | 500L |
116 | 8 | 39 | 1.one | ||||||||||||
a hundred forty five | ten | 32 | .9 | ||||||||||||
SGAT11 | 102 | 7 | 57 | one.6 | forty four/50 | 1900 | 720 | 1600 | 465 | 3/4″ | gentle start | 62 ±2 | 500L | ||
116 | 8 | fifty three | one.5 | ||||||||||||
145 | ten | forty six | one.three | ||||||||||||
SGAT15 | 102 | seven | eighty five | 2.5 | fifteen/twenty | 1900 | 720 | 1600 | 510 | three/four” | comfortable start off | sixty five ±2 | 500L | ||
116 | 8 | eighty one | 2.three | ||||||||||||
one hundred forty five | ten | seventy four | two.1 |
Q1: What is the rotor speed for the air finish?
A1: 2980rmp.
Q2: What’s your lead time?
A2: usually, 5-7 days. (OEM orders: 15days)
Q3: Can you offer water cooled CZPT?
A3: Yes, we can (usually, air cooled kind).
Q4: What’s the payment term?
A4: T/T, L/C, CZPT CZPT, etc. Also we could accept USD, RMB, and other currency.
Q5: Do you accept CZPT voltage?
A5: Yes. 380V/50Hz/3ph, 380V/60Hz/3ph, 220V/50Hz/3ph, 220V/60Hz/3ph, 440V/50Hz/3ph, 440V/60Hz/3ph, or as per your requests.
Q6: What is your guarantee for CZPT?
A6: One year for the whole CZPT(not including the usage spare parts) and technical supports can be presented according to your requirements.
Q7: Can you accept OEM orders?
A7: Sure, OEM orders are warmly welcome.
Q8: How about your customer service and after-sales service?
A8: 24hrs on-line support, 48hrs problem solved promise.
Q9: Do you have spare parts in stock?
A9: Yes, we do.
Q10: What kind of initial lubrication oil you used in CZPT?
A10: TOTAL 46# mineral oil.