CZPTR New CZPTic Chiller CZPT None Oil Centrifugal Chiller for Sale
1. Chiller COP up to 6.seven (GB doing work condition) CZPT preserving ≥50%
2. Chiller IPLV up to 11.6 (AHRI operating situation)
three. Chiller Unit working sounds is considerably less than 74dB (A)
4. R134a refrigerant ,environmentally welcoming
five. High performance slipping movie evaporator
six. CZPTly oil-totally free design, a lot more effective
7. Using HanBell two-phase magnetic bearing centrifugal compressor
eight. High-efficiency liquid-cooled VFD, tiny dimensions and substantial performance
nine. M-Sensible clever handle technique, quickly commence/cease and restart
CZPT Info
Model SHM- | 400WS | 450WS | 500WS | 800WD | 900WD | 1000WD | |
CZPT Ability | kW | 1406 | 1582 | 1758 | 2813 | 3164 | 3516 |
Enter Energy | kW | 210 | 240 | 272 | 420 | 480 | 544 |
Entire load COP | kW/kW | six.seven | 6.59 | 6.forty six | 6.seven | six.59 | 6.forty six |
kW/RT | .fifty three | .fifty three | .54 | .53 | .53 | .fifty four | |
IPLV | kW/kW | eleven.58 | 11.fifty eight | eleven.fifty eight | eleven.fifty eight | 11.fifty eight | 11.fifty eight |
Condenser | |||||||
H2o Stream | mthree/h | 302 | 340 | 378 | 605 | 680 | 756 |
Drinking water force drop | kPa | seventy eight | 50 | sixty | sixty five | eighty | eighty five |
Drinking water relationship | DN | 200 | 250 | 250 | 300 | three hundred | three hundred |
Evaporator | |||||||
Drinking water Movement | mthree/h | 242 | 272 | 302 | 484 | 544 | 605 |
H2o Strain Drop | kPa | 52 | 82 | 90 | fifty | sixty five | 70 |
Drinking water link | DN | 200 | 200 | two hundred | three hundred | three hundred | three hundred |
Dimension | |||||||
A(Duration) | mm | 4000 | 4570 | 4570 | 5500 | 5500 | 5500 |
B(Width) | mm | 2250 | 2400 | 2400 | 2550 | 2550 | 2550 |
C(Height) | mm | 2600 | 2600 | 2600 | 2650 | 2650 | 2650 |
Set up Dimension | |||||||
D | mm | 2944 | 3688 | 3688 | 4340 | 4340 | 4340 |
E | mm | 1700 | 1800 | 1800 | 2050 | 2050 | 2050 |
CZPT weight | kg | 6000 | 7000 | 7500 | 11500 | 12500 | 13000 |
Operation bodyweight | kg | 7000 | 8000 | 8500 | 13000 | 14000 | 14500 |
Refrigerant charge | kg | 360 | 400 | 450 | seven-hundred | 800 | 900 |
- Operating circumstances (GB/T 18430.one-2007)
Evaporator: H2o outlet 7ºC, h2o movement: .172 m³ / (h * kw)
Condenser: H2o inlet 30ºC, water movement: .215 m³ / (h * kw)
IPLV knowledge is dependent on AHRI CZPT
- Equally condenser and evaporator are linked by flange
- Refrigerant:R134a
- Voltage: 3φ-380 ~460V-50Hz
- Regular drinking water pressure of chiller :one.0MPa
- Unit conversion: 1RT = 3.517kW
About CZPTR
CZPT Freezing CZPTry (HangZhou)Co., Ltd. is a joint enterprise which was set up by domestic Huizhuo and Japan Ronghe company with a overall investment decision of 50 million Yuan in 2017. It positioned in HangZhou CZPT and Technological CZPT Zone . Combined with Japan R&D centre and ZheJiang University of CZPT, We are fully commited to industrial chiller, central air conditioner, magnetic centrifugal chiller R&D and manufacture.
Our Major Item:
one) CZPTic Bearing Centrigufal Chiller
2) Water cooled CZPT Chiller, Air cooled screw Chiller, Flooded kind CZPT Chiller ,Evaporative Cooled CZPT Chiller
3) Water cooled Scroll Chiller, Air cooled Scroll Chiller
4) Water-cooled Packaged air conditioner, Air-cooled Packaged air conditioner , clean constant temperature and humidity air conditioner, CZPT air conditioning
5) Low temperature chiller(0ºC to -50ºC)
6) Anti-corrosion Chiller , Explosion-evidence Chiller, and so forth.
Manufacturing unit show
We have our own laboratories and prefessional tests Line. All CZPTR chillers are factory analyzed below load problems to make certain easy installation for users.
Cases
Certificate
Deal
CZPT movie + wooden body/wooden box for exporting
FAQ
Q1: Are you a manufacturer?
A1: Yes, we have a lot more than 10 a long time in h2o chiller business. New plant was bulit in 2017 in HangZhou CZPT&Technological CZPT Zone. Welcome to pay a visit to us at any time!
Q2: Could you aid us to suggest the design for our venture?
A2: Indeed, we have engineer to verify the information and make the plan for you. Primarily based on the following:
one)CZPT potential
two) Refrigerant
three) Ambient temperature
4)Voltage
five) For what market
six)The developing drawing(if you have)
7)Any other specific requirements.
Q3: How to guarantee your merchandise with excellent top quality?
A3: We use the nicely-know manufacturer accessories, this sort of as CZPT , CZPT, danfoss compressor, Emerson growth Valve, Siemens controller. All CZPTR chillers are factory tested under load circumstances to guarantee good good quality and straightforward set up for customers.
Q4: What’s the warrenty?
A4: 1 year warrenty for totally free if verified by equally aspect harm in the high quality purpose.
Q5: Whats your payment time period?
A5: We acknowledge TT, LC, CZPT CZPT, and so forth. Generally ,thirty% deposit for manufacturing, 70% harmony before cargo.
Q6: How can I place an get?
A6: Make contact with us via produced in China or speak to under information.
Ms.Livia
Tel: twenty 31605718-820
Cell: 13595716431